QuickServer Start-Up Guide
Page 21 of 71
6
OPERATION
6.1 Power Up the Device
Apply power to the device. Ensure that the power supply used complies with the specifications provided.
Ensure that the cab
le is grounded using the “Frame GND” terminal. The QuickServer is factory set for
9-30V DC or 12-24V AC.
6.2 Connect the PC to the QuickServer Over the Ethernet P ort
•
Connect an Ethernet cable between the PC and QuickServer or connect the QuickServer and the
PC to the switch using a straight Cat-5 cable.
•
The Default IP Address of the QuickServer is
192.168.2.101
, Subnet Mask is
255.255.255.0
.
Ethernet Port
Figure 15: Connecting Power
Figure 16: Ethernet Port
PWR+
PWR-
FG