The status LEDs should be clearly visible.
•
There should be adequate space (approximately two
inches) on all sides for proper air flow.
Before rack mounting the switch, pay particular attention to the
following factors:
•
Temperature
: Since the temperature within a rack
assembly may be higher than the ambient room
temperature, check that the rack-environment temperature
is within the specified operating temperature range.
•
Mechanical Loading
: Do not place any equipment on top
of a rack-mounted switch.
•
Circuit Overloading
: Be sure that the supply circuit to the
rack assembly is not overloaded.
•
Grounding
: Rack-mounted equipment should be properly
grounded. Particular attention should be given to supply
connections other than direct connections to the mains.
Make sure twisted-pair cable is always routed away from
power lines, fluorescent lighting fixtures and other sources of
electrical interference such as radios and transmitters.
Make sure that a properly grounded power outlet is within 2.44
meters (8 feet) of the switch and is powered from an
independent circuit breaker. As with any equipment, using a