Lochinvar ProtoNode Start-up Guide
Page 50 of 56
Appendix C.4 Copper-Fin II Modbus RTU Mappings to BACnet and Metasys N2
Point Name
BACnet
Object Type
BACnet
Object ID
N2 Data
Type
N2
Address
Stage 1 Enable
BV
1
DO
1
Stage 2 Enable
BV
2
DO
2
Stage 3 Enable
BV
3
DO
3
Stage 4 Enable
BV
4
DO
4
Tank Thermostat
BV
5
DO
5
High Limits
BI
6
DI
6
Flow Switch
BI
7
DI
7
Gas Pressure Switch
BI
8
DI
8
Louver Proving Switch
BI
9
DI
9
Air Pressure Switch
BI
10
DI
10
Flame 1
BI
11
DI
11
Stage 1 On
BI
12
DI
12
Tank Thermostat
BI
13
DI
13
Stage 2 On
BI
14
DI
14
Stage 3 On
BI
15
DI
15
Stage 4 On
BI
16
DI
16
Flame 2
BI
17
DI
17
Enable 2
BI
18
DI
18
Run Time Contacts
BI
19
DI
19
Alarm Contacts
BI
20
DI
20
HTR Pump
BI
21
DI
21
DHW Pump
BI
22
DI
22
Louver Relay
BI
23
DI
23
Gas Valve 1
BI
24
DI
24
System Pump
BI
25
DI
25
Gas Valve 2
BI
26
DI
26
Gas Valve 3
BI
27
DI
27
Gas Valve 4
BI
28
DI
28
Discrete Inputs 01-16
AI
29
AI
29
Discrete Inputs 17-32
AI
30
AI
30
Discrete Inputs 33-48
AI
31
AI
31
System Cascade Setpoint
AI
32
AI
32
System Pump Speed
AI
33
AI
33
Cascade Total Power
AI
34
AI
34
Cascade Current Power
AI
35
AI
35
Outlet Setpoint
AI
36
AI
36
Outlet Temperature
AI
37
AI
37
Inlet Temperature
AI
38
AI
38
Pool Temperature
AI
39
AI
39
Firing Rate
AI
40
AI
40
Boiler Status Code
AI
41
AI
41
Boiler Blocking Code
AI
42
AI
42
Boiler Lockout Code
AI
43
AI
43
Configuration
AV
45
AO
45
Coils
AV
46
AO
46
0-10 Volt Input
AV
47
AO
47
Pool Setpoint
AV
48
AO
48
Tank Temperature
AV
49
AO
49
Outdoor Temperature
AV
50
AO
50
System Supply Temperature
AV
51
AO
51
System Return Temperature
AV
52
AO
52
Appendix C.5 Power Fin Modbus RTU Mappings to BACnet and Metasys N2
Point Name
BACnet
Object Type
BACnet
Object ID
N2 Data
Type
N2
Address
Boiler Enable/Room Thermostat 1/Stg 1
BV
1
DO
1
Tank Thermostat
BV
2
DO
2
Manual Reset High Limit 1
BI
3
DI
3
Flow Switch 1
BI
4
DI
4