3-3
Mounting
3
Mounting
This switch can be mounted in a standard 19-inch equipment rack or on a desktop or
shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following factors:
• Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range. (See page C-1.)
• Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
• Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1.
Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Figure 3-2 Attaching the Brackets
Содержание 8126PL2-F
Страница 1: ...INSTALLATION GUIDE ta TigerSwitchTM 10 100 1000 L2 Lite SMB PoE Gigabit Switch SMC8126PL2 F ...
Страница 14: ...x ...
Страница 20: ...xvi ...
Страница 40: ...3 8 Installing the Switch 3 ...
Страница 54: ...B 6 Cables B ...
Страница 58: ...C 4 Specifications C ...
Страница 60: ...Ordering Information D 2 D ...
Страница 67: ......
Страница 68: ...20 Mason Irvine CA 92618 Phn 949 679 8000 www smc com 150200062800A R02 150200000032A R01 SMC8126PL2 F ...