Maintenance instructions EN 1176-1 

 

 

Visual routine inspection 

 
Frequency will be based on local conditions (high/low use, vandalism, air pollution, effects of weather). 

 

 

The nets are to be checked for damage.  
 

o

 

If a strong damage is discovered, e.g. a break in the wire, smb needs to be consulted.  
 

o

 

If only the rope coating is damaged and no wire is broken, there is no urgent need for repair. 
Please Note: Frayed filament can be fused with a flame (e.g. pocket lighter). 

 
 
 
Operational inspection (semi-annual)  

(in addition to the visual routine inspection) 

 

 

Check the 

ROWOCON

®

-connections for a firm fit. 

o

 

If a damage is discovered, smb needs to be consulted. 

 

 

 

The screwing of the goal frame needs to be checked (missing safety caps are to be replaced)  

o

 

If necessary, re-tighten the screwing.

 

 

 

Check the stability of the goal. 

o

 

Stand in front of the goal and at the top crossbar, tilt it back and forth. 

o

 

If  there  is  a  noticeable  instability  /  tilting,  check  the  respective  boltings  and  re-tighten.  See 
figure 4 for the procedure.  

Содержание citytor Original11 BT 02

Страница 1: ...ached to a tube of the goal lower left corner Technical Details The smb citytor original II is made of screwable round tubes with a diameter of 82 5 x 3 2 mm for the frame tubes in the front and 60 3 x 2 9 mm for the frame tubes in the back The net of the goal is made of black Herkules rope 8 mm The maximum mash size is 36 x 122 mm so that EN 1176 1 is met for children from 0 to 3 years Figure 1 c...

Страница 2: ...e nets without having to remove or disassemble the entire goal Placing of the ground anchors into the concrete foundations The ground anchors are to be set into the concrete foundations on the same level as the play level Please make sure that the side with the movable slide block shows to the top figure 4 We have calculated a depth of 150 mm for the sub construction of the play level According to...

Страница 3: ...of the goal net are not fixed at this point Figure 4 Remove the safety covers of the ground anchors with a screwdriver Figure 3 The entire goal is to be adjusted via the ground anchors 1 We recommend the storage of the safety covers for a possible reuse later on Now the supplied screws M16x70 5 and lock washers 7 can be bolted with the help of the provided socket key insertion The flexibility of t...

Страница 4: ...pe coating is damaged and no wire is broken there is no urgent need for repair Please Note Frayed filament can be fused with a flame e g pocket lighter Operational inspection semi annual in addition to the visual routine inspection Check the ROWOCON connections for a firm fit o If a damage is discovered smb needs to be consulted The screwing of the goal frame needs to be checked missing safety cap...

Отзывы: