background image

 

 

Technical Information 

smb 

Seilspielgeräte GmbH Berlin

 

 

Technikerstraße 6/8 

 

Type BT 02

 

D - 15366 Hoppegarten 

 

Phone +49 (0)3342 50837 20 

 

Fax     +49 (0)3342 50837 80 

 

www.smb-seilspielgeraete.de

 

Page 2 

 
 

Technical Details 

 

 

The  net  ends  are  pressed  into  aluminum  sleeves  by  taking  three  ropes  at  a  time.  These  pressed 
aluminum  sleeves,  located  in  the  back  of  the  net  parts  and  in  both  side  parts,  are  inserted  into  the 

ROWOCON

®

-sleeves 

and fixed with setscrews M10x8 A2, Torx T30. These setscrews have a polyamide 

spot  coating  to  prevent  removal. 

This  connection  also  prevents  an  unwanted  loosening  of  the 

screwing and enables at the same time an easy exchange of the nets, without having to remove or 
disassemble the entire goal    

 

 
Placing of the ground anchors into the concrete foundations 
 

 

The ground anchors are to be set into the concrete foundations on the 

same level as the play level

Please make sure that the side with the movable slide block shows to the top (figure 4).

 We have 

calculated a depth of 150 mm for the sub-construction of the play level. According to this, the top edge of 
the foundations C20/25 (B25) is 150 mm below play level. When placing the concrete, a drainage is to be 
provided 

(Figure 2)

.

 

 

 
If the sub construction needs to be larger as 150 mm, please consult smb. 
 
 
 
 
 
 
 

The correct screwing and positioning of the goal depends on the correct placing of the 
ground anchors!  
Thus, the work is to be carried out accurately, taking into account the measurements of the 
drawing. 

Figure 2       
 
All measurements in mm!      
 
 

Содержание citytor Original11 BT 02

Страница 1: ...ached to a tube of the goal lower left corner Technical Details The smb citytor original II is made of screwable round tubes with a diameter of 82 5 x 3 2 mm for the frame tubes in the front and 60 3 x 2 9 mm for the frame tubes in the back The net of the goal is made of black Herkules rope 8 mm The maximum mash size is 36 x 122 mm so that EN 1176 1 is met for children from 0 to 3 years Figure 1 c...

Страница 2: ...e nets without having to remove or disassemble the entire goal Placing of the ground anchors into the concrete foundations The ground anchors are to be set into the concrete foundations on the same level as the play level Please make sure that the side with the movable slide block shows to the top figure 4 We have calculated a depth of 150 mm for the sub construction of the play level According to...

Страница 3: ...of the goal net are not fixed at this point Figure 4 Remove the safety covers of the ground anchors with a screwdriver Figure 3 The entire goal is to be adjusted via the ground anchors 1 We recommend the storage of the safety covers for a possible reuse later on Now the supplied screws M16x70 5 and lock washers 7 can be bolted with the help of the provided socket key insertion The flexibility of t...

Страница 4: ...pe coating is damaged and no wire is broken there is no urgent need for repair Please Note Frayed filament can be fused with a flame e g pocket lighter Operational inspection semi annual in addition to the visual routine inspection Check the ROWOCON connections for a firm fit o If a damage is discovered smb needs to be consulted The screwing of the goal frame needs to be checked missing safety cap...

Отзывы: