Technical Details
The net ends are pressed into aluminum sleeves by taking three ropes at a time. These pressed
aluminum sleeves, located in the back of the net parts and in both side parts, are inserted into the
ROWOCON
®
-sleeves
and fixed with setscrews M10x8 A2, Torx T30. These setscrews have a polyamide
spot coating to prevent removal.
This connection also prevents an unwanted loosening of the
screwing and enables at the same time an easy exchange of the nets, without having to remove or
disassemble the entire goal
Placing of the ground anchors into the concrete foundations
The ground anchors are to be set into the concrete foundations on the
same level as the play level
.
Please make sure that the side with the movable slide block shows to the top (figure 4).
We have
calculated a depth of 150 mm for the sub-construction of the play level. According to this, the top edge of
the foundations C20/25 (B25) is 150 mm below play level. When placing the concrete, a drainage is to be
provided
(Figure 2)
.
If the sub construction needs to be larger as 150 mm, please consult smb.
The correct screwing and positioning of the goal depends on the correct placing of the
ground anchors!
Thus, the work is to be carried out accurately, taking into account the measurements of the
drawing.