10
5 Point Calibration: (Bottom, ¼, ½, ¾ & Top)
The display will show:
Fill the tank to the required TANK LOW LEVEL, minimum suggested is liquid just covering the sensor. Wait
for approx. 60 seconds for the fluid to settle and press the Pump key. The
display will show “Setting Level
Please Wait”.
The display will now show:
Fill the tank to the 1/4 LEVEL. Wait for approx. 60 seconds for the fluid to settle and press the Enter key. The
display will show “Setting 1/4 Please Wait”.
The display will now show:
Fill the tank to the 1/2 LEVEL. Wait for approx. 60 seconds for the fluid to settle and press the Enter key. The
display will show
“Setting 1/2 Please Wait”.
Tank
High Point
Low Point
3/4 Point
Half Point
1/4 Point
Voltage from Sensor (see table 1 page 19)
Set
Low Level
Input = ??????? V
Set
1/4 Level
Input = ??????? V
Set
1/2 Level
Input = ??????? V
Содержание TD-1000
Страница 1: ...TD 1000 Tank Monitor Installation Manual...