11
The display will now show:
Fill the tank to the 3/4 LEVEL. Wait for approx. 60 seconds for the fluid to settle and press the Enter key. The
display will show “Setting 3/4 Please Wait”.
The display will now show:
Fill the tank to the FULL LEVEL. Wait for approx. 60 seconds for the fluid to settle and press the Enter key.
The display will show “Setting Level Please Wait”.
If no fluid is added between each step the display will show:
For more information see “Calibration Tips & Tricks” on our web site www.smartswitch.co.nz
Table 1:
SmartSwitch strongly recommends that Table 1 be used to record voltages for each tank level at time of tank
calibration. These voltages will be displayed during the calibration setup.
Reason: Should the TD-1000 ever need to be replaced the tank will need to be re-calibrated, but if table 1
has been filled out then creating these input voltages using a potentiometer can be done without the tank
sender connected, making the process very simple.
Input
Tank Name
Empty
1/4
1/2
3/4
Full
Level
Sensor
Set Full Point
Input = ?.?? v
Table 1
Set
3/4 Level
Input = ??????? V
The ??? Level
is not greater
than the Low level
Содержание TD-1000
Страница 1: ...TD 1000 Tank Monitor Installation Manual...