BEFORE YOU START:
Read all instructions carefully
Identify all parts and check quantities against parts list
Select a level site
Do not mark cladding with pencil as lead can cause corrosion to cladding
SAFETY:
Do not attempt to build your shed in high winds
Beware of sharp edges, recommend use of gloves
Protect your eyes and ears
For ease of assembly, use a friend to help
TOOLS REQUIRED:
WARRANTY REQUIREMENTS
:
Following are the minimum requirements for cladding used in Smart Store Sheds.
Wash all surfaces annually using a hose and soft nylon brush.
Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon
as possible to remove any highly corrosive salt deposits.
Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters.
Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding
.
DRILL
RIVETER
PHILLIPS DRILL BIT 3.5mm DRILL BIT
HAMMER
LADDER
TAPE MEASURE
PEN
NAIL PUNCH
CONGRATULATIONS ON PURCHASING A SMART STORE SHED.
BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS:
2
Содержание SS1515
Страница 1: ...ASSEMBLY INSTRUCTIONS SS1515 BASE SIZE 1 520m x 1 520m...
Страница 2: ......
Страница 14: ......