background image

 

 

ROOF  ASSEMBLY 

STEP 2: 

 

 

Position the Roof Sheets with the back lining up with the outside edge 
of the back wall cladding, as in 

fig. 2

 

 

Using 4 x 40mm weatherseals, nail the Roof Sheets to the Top Plates 
at each corner, ensuring ribs on the Roof Sheets line up with ribs on 
the Wall Sheets (

fig.3

).

 

11 

fig.3 

STEP 4: 

 

 

Place the Ridge Flashing in position ensuring flashing does not extend 
past side wall cladding.

 

 

 

Rivet Ridge Flashing to roof and back wall, riveting at the ends and at 
each join of the roof sheets (

fig. 2

). 

fig.4 

X 4 

X 4 

Barge

 

STEP 1: 

 

 

Ensure Shed is sitting level and square. 

 

 

Lay Roof Sheets on the Top Plates (with slots at front). 

 

 

Rivet sheets together at overlaps with 2 x rivets per join (

fig. 1)

.

 

STEP 3:

 

 

 

Ensure the Front and Back Top Plates are straight. Nail the roof sheets 
to the front & back Top Plates, using 1 x nail per pan (

fig.3

). 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR 

ROOF PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets 
overlap the standard roof sheets on both sides.  
The Clear Roof Panel must be secured to the front and back 
Top Plates. Pre drill and fasten with the 40mm weatherseal 
nails provided.

.

 

SELECT: 

 

3 x 1.110 Roof Sheets 

1 x 1.550 Spouting 

2 x 1.110 Barges 

1 x 1.550 Ridge Flashing 

20 x 40mm Weatherseal Nails 

30 x Rivets 

fig. 2 

X 4 

X 4 

RIDGE

 

FLASHING

 

ROOF

 

SHEET

 

BACK WALL 

SHEET

 

SIDE 

WALL 

FRONT WALL 

BACK WALL 

SIDE 

WALL 

BOTTOM PLATE 

TOP PLATE 

fig.1 

STEP 5: 

 

 

 

Place barge flashings on roof at end of shed ensuring the diagonal 
trimmed end is at the front. 

 

 

Rivet the Barge Flashings to the roof and the side wall, using four rivets 
on top of barge and four into the side (

fig.4

).

 

STEP 6:

 

 

 

Place spouting in position and rivet to Barge Flashings at each end and 
rivet to roof sheets (1 rivet per 1 sheet). 

Содержание SS1510

Страница 1: ...ASSEMBLY INSTRUCTIONS SS1510 BASE SIZE 1 520m x 1 020m...

Страница 2: ......

Страница 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Страница 4: ...255 m 2 Door 3 4 Sheet 1 810 m 2 Barge 1 110 m 2 TIMBER Ridge Flashing 1 550 m 1 Bottom Plates H4 Green Front Back 1 520 m 2 Padbolt Support 0 140 m 1 Bottom Plates H4 Green Sides 1 020 m 2 Spouting...

Страница 5: ...nt Bottom Plate Side Back Wall Sheets 3 Sheets Front Wall Sheet Door Jambs Door Sheets Door Side Chan Padbolt Support Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION 2 ASSEMBL...

Страница 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Страница 7: ...Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto b...

Страница 8: ...then nail along the wall sheet to the Top Plate two clouts per pan see fig 1 STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring each side of wall sheets overhangs the end of Bottom...

Страница 9: ...ng the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensur...

Страница 10: ...mm below top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing Ensure the door closes properly then fit remaining rivets STEP 3 Place 1 x Wall Sheet on timber plates Ens...

Страница 11: ...ey are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 75mm screws screw the Top Plates together Using 4 x 40mm screws screw the Bot tom Plates together STE...

Страница 12: ...e roof sheets to the front back Top Plates using 1 x nail per pan fig 3 IMPORTANT FOR SHEDS WITH OPTIONAL CLEAR ROOF PANEL Assemble as below making sure that the Clear Roof Sheets overlap the standard...

Страница 13: ...x to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two...

Страница 14: ......

Страница 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...