ASSEMBLE DOOR 

SELECT: 

 

2 x 1.810 m Door Sheets 

2 x 0.945 m  Door Top/Bottom Channels 

2 x 1.810 m Door Side Flashings 

3 x Hinges 

1 x Padbolt Support Flashing 

2 x 1.255 m  Door Brace Flashings 

36 x Rivets 

STEP 1: 

 

 

Lay out door sheets on a flat surface making sure narrow pans 

are on the outside. 

 

 

Slide door top and bottom channels on each end as shown in 

fig. 1

 

 

 

Rivet sheets together. 

STEP 2: 

 

 

Position door side flash-

ings and assemble door 

as shown. 

 

 

Drill and rivet as per dia-

gram, ensuring rivets 

penetrate into door sheet. 

 

STEP 4: 

 

 

Rivet door brace flashings onto back 

of door as shown. Where possible, 

rivet from front of door. 

 

 

Ensure the door brace flashings are 

at least 50mm from top and bottom of 

door, and 10mm from the side to 

clear top and bottom timber plate, 

when hung. 

fig.2 

fig.1 

STEP 3: 

 

 

Attach hinges to door side 

channel using rivets provided. 

 

 

Using one rivet, attach padbolt 

support as shown in 

fig. 2

 

NARROW PANS 

Содержание SS1510

Страница 1: ...ASSEMBLY INSTRUCTIONS SS1510 BASE SIZE 1 520m x 1 020m...

Страница 2: ......

Страница 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Страница 4: ...255 m 2 Door 3 4 Sheet 1 810 m 2 Barge 1 110 m 2 TIMBER Ridge Flashing 1 550 m 1 Bottom Plates H4 Green Front Back 1 520 m 2 Padbolt Support 0 140 m 1 Bottom Plates H4 Green Sides 1 020 m 2 Spouting...

Страница 5: ...nt Bottom Plate Side Back Wall Sheets 3 Sheets Front Wall Sheet Door Jambs Door Sheets Door Side Chan Padbolt Support Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION 2 ASSEMBL...

Страница 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Страница 7: ...Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto b...

Страница 8: ...then nail along the wall sheet to the Top Plate two clouts per pan see fig 1 STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring each side of wall sheets overhangs the end of Bottom...

Страница 9: ...ng the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensur...

Страница 10: ...mm below top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing Ensure the door closes properly then fit remaining rivets STEP 3 Place 1 x Wall Sheet on timber plates Ens...

Страница 11: ...ey are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 75mm screws screw the Top Plates together Using 4 x 40mm screws screw the Bot tom Plates together STE...

Страница 12: ...e roof sheets to the front back Top Plates using 1 x nail per pan fig 3 IMPORTANT FOR SHEDS WITH OPTIONAL CLEAR ROOF PANEL Assemble as below making sure that the Clear Roof Sheets overlap the standard...

Страница 13: ...x to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two...

Страница 14: ......

Страница 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: