SECURING SHED
12
Secure your shed using Treated Timber Pegs or a Bolt Down Kit
TIMBER PEGS—WOODEN FLOOR
The optional Smart Store Timber Peg Down Kit includes six H5 treated
timber pegs that can be hammered into the ground and then attached to
the Base Plate with stainless steel screws. A Sentry timber floor can then
be fitted on top of the Base Plate.
BOLT DOWN KIT—CONCRETE
The optional Smart Store Bolt Down Kit includes 6 x galvanised
brackets, screws and dynabolts.
Space the brackets evenly around the shed and fix to the Bottom
Plate and the concrete slab. A 10mm masonry drill bit is required.
OPTIONAL SENTRY FLOOR
Position the Floor Joists centrally between the side
Base Plates and skew nail each end with two 75mm
nails.
Check that the shed is sitting level and square and
that the diagonal Bottom Plate measurements are the
same.
Place the floor boards in position and nail securely
(6 x 50mm nails per board).
IMPORTANT—
CLEAN UP
REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS THOROUGHLY. FAILURE TO DO THIS
WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY
.
FIT PADBOLT
Rivet Padbolt to door and keeper onto Door Jamb as
shown.
YOUR SMART STORE SHED IS NOW COMPLETE. RELAX
…...
FRONT BASE PLATE
BACK BASE PLATE
JOIST
Содержание SS1510
Страница 1: ...ASSEMBLY INSTRUCTIONS SS1510 BASE SIZE 1 520m x 1 020m...
Страница 2: ......
Страница 14: ......