background image

 

 

SECURING SHED

 

Secure your shed using Treated Timber Pegs or a Bolt Down Kit

 

TIMBER PEGS—WOODEN FLOOR

 

 

• 

The optional Duratuf Timber Peg Down Kit includes six H5 treated timber 
pegs that can be hammered into the ground and then attached to the 
Base Plate with stainless steel screws. A Smart store timber floor kit can 
then be fitted on top of the Base Plate if required.

 

BOLT DOWN KIT—CONCRETE

 

 

• 

The optional Duratuf Bolt Down Kit includes 6 x galvanised 
brackets, screws and  dynabolts.

 

 

• 

Space the brackets evenly around the shed and fix to the Bottom 
Plate and the concrete slab. A 10mm masonry drill bit is required.

 

FITTING A SMART STORE FLOOR KIT 

(OPTIONAL)

 

 

• 

Position the Floor Joists centrally between the side 
Base Plates and skew nail each end with two 75mm 
nails.

 

 

• 

Check that the shed is sitting level and square . Check 
that the diagonal Bottom Plate measurements are the 
same. This ensures that the shed base is square.

 

 

• 

Place the Floor Boards in position. (You may need to 
cut the last Floor Board to the correct width using a 
Skill Saw.) Nail each Floor Board in, using two 50mm 
nails each end and two nails into each floor joist. 

 

IMPORTANT—

 

CLEAN UP

 

 

REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS THOROUGHLY. FAILURE TO DO THIS 
WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY

.

 

FIT PADBOLT

 

 

• 

Rivet Padbolt to door and keeper onto Door Jamb as 
shown.

 

14

 

FRONT BASE PLATE

 

BACK BASE PLATE

 

JOIST

 

JOIST

 

YOUR DURATUF SMART STORE SHED IS NOW COMPLETE. RELAX

…...

 

JOIST

 

Содержание SM2020

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2020 BASE SIZE 2 020m x 2 020m...

Страница 2: ......

Страница 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Страница 4: ...of 2 200m 4 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2 Door Jamb 1 890m 2 Door Brace 1 160m 2 Barge 1 102m 4 Ridge Cap 2 055m 1 Spouting 2 055m 2 Door Top Bottom 0 945m 2 Hardware Pack 1 Touchup P...

Страница 5: ...RIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 2 020 m 2 Front Back Top Plate H1 Red 2 020 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 4...

Страница 6: ...e Back Wall Sheets Front Wall Sheet Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Flashing Ridge Beam Jack Stud Ridge Flashing 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...bottom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the b...

Страница 9: ...3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by a...

Страница 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Страница 11: ...ion approx 20mm below top of top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on tim...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...surface and use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a...

Страница 14: ...nd rivet to Barge Flashings at each end and rivet to roof sheets 1 rivet per 1 sheet fig 4 Clout Screw fig 1 Pan Rib STEP 3 Ensure shed is sitting level and square Beginning from the left hand end loo...

Страница 15: ...FLOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal...

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: