ASSEMBLE FRONT PANEL

 

10

 

15mm

 

15mm

 

15mm

 

15mm

 

BOTTOM PLATE

 

1854mm

 

1854mm

 

TOP PLATE

 

530mm

 

960mm

 

TOP PLATE

 

DOOR OPENING

 

Plan View

 

TOP

 

PLATE

 

DOOR

 

JAMB

 

NAIL

 

x3

 

x3

 

x3

 

SELECT:

 

 

2 x 1.890 Wall Sheets

 

1 x 2.020 Top Plate (Red)

 

1 x 2.020 Bottom Plate (Green)

 

2 x 1.890 Door Jamb Flashings

 

28 x 30mm Galv Clouts

 

17 x Rivets

 

STEP 1:

 

 

• 

Lay out 1 x Top Plate and 1 x Bottom Plate on a flat 
surface as shown 

 

STEP 2:

 

 

• 

Using 2 x 30mm clouts, nail the Door Jamb Flashing flush with 
the top of the Top Plate at the correct  measurement as shown 
in plan view. Pre drill holes using a 3.5mm drill bit

 

 

• 

Check the distance between the top and bottom plates then use 
a further 2 x 30mm clouts to nail the Door Jamb Flashings to 
the bottom Plate. Pre drill holes.

 

STEP 4:

 

 

• 

Place the door on the panel (In open position, approx 
20mm below top of top plate). Using two rivets, rivet the top 
and bottom hinges to the Door Jamb Flashing, ensuring 
door closes properly. 

 

 

• 

Fit remaining rivets.

 

STEP 3:

 

 

• 

Place 2 x Wall Sheets on timber.

 

 

• 

Ensure that the top of the sheets are flush with the top of the 
Top Plate and that the sides of the wall sheets overhang the 
Top Plate by 

15mm

 as shown. Nail wall sheets to Top Plate 

(two clouts per pan)

 

 

• 

Nail the wall sheets to the Bottom Plate making sure that the 
Plates are the correct distance apart and that the sides of the 
wall sheets overhang the Bottom Plate by 

15mm

.

 

 

• 

Drill & rivet Door Jamb Flashings to wall sheets using four 
rivets equally spaced on each side.

 

NOTE: 

Door can be hinged on either side.

 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 

BASE PLATE –READ THE FOLLOWING;

 

 

For sheds with Raised Base Plate option only (see page 6), deduct 

30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

.

 

Содержание SM2020

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2020 BASE SIZE 2 020m x 2 020m...

Страница 2: ......

Страница 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Страница 4: ...of 2 200m 4 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2 Door Jamb 1 890m 2 Door Brace 1 160m 2 Barge 1 102m 4 Ridge Cap 2 055m 1 Spouting 2 055m 2 Door Top Bottom 0 945m 2 Hardware Pack 1 Touchup P...

Страница 5: ...RIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 2 020 m 2 Front Back Top Plate H1 Red 2 020 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 4...

Страница 6: ...e Back Wall Sheets Front Wall Sheet Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Flashing Ridge Beam Jack Stud Ridge Flashing 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...bottom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the b...

Страница 9: ...3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by a...

Страница 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Страница 11: ...ion approx 20mm below top of top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on tim...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...surface and use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a...

Страница 14: ...nd rivet to Barge Flashings at each end and rivet to roof sheets 1 rivet per 1 sheet fig 4 Clout Screw fig 1 Pan Rib STEP 3 Ensure shed is sitting level and square Beginning from the left hand end loo...

Страница 15: ...FLOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal...

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: