ROOF  ASSEMBLY

 

SELECT:

 

 

4 x 2.200 m Roof Sheets

 

2 x 2.055 m Spouting

 

4 x 1.102 m Barges

 

1 x 2.055 m  Ridge Flashing

 

1 x 2.020 m Ridge Beam

 

2 x 0.200 m Jack Studs

 

8 x 75mm Screws

 

27 x 50mm Roofing Screws

 

58 x Rivets

 

4 x 50mm Clouts

 

 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR 

ROOF PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets 
overlap the standard roof sheets on both sides. 

 

The Clear Roof Panel must be secured to the Top Plate and the 
Ridge Beam. Pre drill and fasten with the 50mm roofing screws 
provided.

.

 

STEP 1:

 

 

• 

Place the Ridge Beam on a level surface and use 2 x 75mm 
screws to secure the Jack Studs to the underside of the Ridge 
Beam, one at each end (

fig. 1

).

 

 

• 

Turn the Ridge Beam /Jack Stud assembly over and place it on 
the timber Top Plate in a central position. 

 

 

• 

Secure with 2 x  75mm screws through the top of the Jack Studs 
into the Timber Top Plate (

fig. 2

).

 

STEP 2:

 

 

• 

Position the first roof sheet with the centre slots over the 
middle of the Ridge Beam. Gently fold the roof sheet over 
the Ridge Beam so that the ends touch the front & back Top 
Plates. 

 

 

• 

Repeat with second roof sheet.

 

 

• 

Rivet sheets together at overlaps ,one  rivet either side of the 
ridge beam (

fig. 3

). 

 

 

• 

Repeat with remaining roof sheets

 

12

 

JACK STUD

 

TOP PLATE

 

RIDGE BEAM

 

fig. 1

 

fig. 2

 

SIDE

 

WALL

 

FRONT 

WALL

 

BACK 

WALL

 

SIDE

 

WALL

 

TOP 

BOTTOM 

RIDGE 

fig. 3

 

Содержание SM2020

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2020 BASE SIZE 2 020m x 2 020m...

Страница 2: ......

Страница 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Страница 4: ...of 2 200m 4 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2 Door Jamb 1 890m 2 Door Brace 1 160m 2 Barge 1 102m 4 Ridge Cap 2 055m 1 Spouting 2 055m 2 Door Top Bottom 0 945m 2 Hardware Pack 1 Touchup P...

Страница 5: ...RIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 2 020 m 2 Front Back Top Plate H1 Red 2 020 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 4...

Страница 6: ...e Back Wall Sheets Front Wall Sheet Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Flashing Ridge Beam Jack Stud Ridge Flashing 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...bottom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the b...

Страница 9: ...3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by a...

Страница 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Страница 11: ...ion approx 20mm below top of top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on tim...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...surface and use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a...

Страница 14: ...nd rivet to Barge Flashings at each end and rivet to roof sheets 1 rivet per 1 sheet fig 4 Clout Screw fig 1 Pan Rib STEP 3 Ensure shed is sitting level and square Beginning from the left hand end loo...

Страница 15: ...FLOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal...

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: