SMA America, LLC
Unpacking and inspection
Installation Guide
SB8-10TL-IUS103811
17
4 Unpacking and inspection
All Sunny Boy inverters are checked before shipping and packaged in sturdy boxes. However the
sturdy boxes do not guarantee that damage will not occur during shipping and delivery.
It is important to carefully inspect the shipping box and contents prior to installation. If you detect any
external damage after unpacking, report the damage immediately to your SMA dealer and to the
shipping company that delivered the unit. If it becomes necessary to return the Sunny Boy, use the
original packing material.
4.1 Scope of delivery
Position Number Description
A
1
Sunny Boy
B
1
Wall-mounting bracket
C
1
Spare screw and spare washer for closing the Sunny Boy lid
2
Screws and washers for fastening the Sunny Boy to the wall-mounting bracket
D
2
Spare jumpers for fan test
E
2
Handle covers (left and right)
F
1
SMA DC Disconnect (type DC-DisconTL-US-10)
G
1
Screw and washer for closing the DC Disconnect lid
2
Screws and washers for fastening the DC Disconnect to the wall-mounting
bracket
If not ordered differently, the SMA Sunny Boy Combiner Box is included in the scope of
delivery as a standard feature. Refer to the appropiate manual for detail information.
Содержание SUNNY BOY 10000TL?US
Страница 2: ......
Страница 10: ...Table of Contents SMA America LLC 10 SB8 10TL IUS103811 Installation Guide...
Страница 21: ...SMA America LLC Mounting Installation Guide SB8 10TL IUS103811 21 Dimensions of the wall mounting bracket...
Страница 71: ......
Страница 72: ...4 NFSJDB 1SPEVDUJPO XXX TNB BNFSJDB DPN 4 NFSJDB 1SPEVDUJPO XXX 4 NFSJDB DPN...