6 Commissioning
SMA Solar Technology AG
26
SPW-WebconPB-IA-en-10
Installation Manual
6.2 Commissioning a Small Plant
Requirements:
☐ The cable must be connected to the communication terminal (see Section 5.3).
☐ The Piggy-Back must be installed in the inverter (see Section 5.4).
☐ The plant must be connected to a router with Internet connection.
☐ DHCP must be enabled for the router.
☐ For Italy, in order to adjust the Sunny Explorer settings for receiving control signals from the
Piggy-Back, you must have a personal SMA Grid Guard code (see Sunny Explorer help).
Procedure:
1. Commission all inverters with installed Piggy-Back (see inverter installation manual).
2. For plants in Italy, in order to adjust the settings to receive control signals from the network
operator in the Piggy-Back, follow the steps below:
• Connect to Sunny Explorer (see Section 6.3.2).
• Enter your personal SMA Grid Guard code in Sunny Explorer (see Sunny Explorer help).
• Set the following parameters in Sunny Explorer (for setting parameters in a device, see
Sunny Explorer help):
• In the field
Application-ID
, enter the Application-ID of the network operator gateway.
You will receive this value from your network operator. You can enter a value between
0
and
16384.
The value
16384
indicates deactivation.
• In the field
Goose-Mac address
, enter the MAC address of the network operator gateway
from which the Piggy-Back is to receive control commands. You will receive this value from
your network operator. If all MAC addresses are to be accepted in the adjustable domain,
enter
01:0C:CD:01:02:00
.
External Communication > IEC 61850 configuration
Parameter
Value/Range
Resolution
Default
Application-ID
0 to 0x4000
1
0x4000
Goose-Mac address
01:0C:CD:01:00:00
…
01:0C:CD:01:02:00
1
01:0C:CD:01:02:00