SMA
Technologie AG
Installation
Installation Guide
SBTLHCMS-IEN080411
Page27
5.
Repeat points 2 and 3 for each string.
6.
Connect up the faultless PV generator strings to
the inverter. Ensure the assignment of the strings
is correct.
7.
Close the unnecessary DC input sockets with the
caps included in the delivery.
8.
Attach the handle of the Electronic Solar Switch.
Notice!
The Electronic Solar Switch can become damaged if it has not been at-
tached properly.
Firmly insert the handle all the way into the socket in the Sunny Boy and
check that it is firmly inserted. Never tighten the screws of the socket inside
the Sunny Boy in order to avoid that the socket locks in place.
Содержание SB 4200TL HC
Страница 2: ......
Страница 6: ...Explanation of the Symbols Used SMA Technologie AG Page 6 SBTLHCMS IEN080411 Installation Guide...
Страница 10: ...Safety Instructions SMA Technologie AG Page 10 SBTLHCMS IEN080411 Installation Guide...
Страница 30: ...Installation SMA Technologie AG Page 30 SBTLHCMS IEN080411 Installation Guide...
Страница 44: ...Technical Data SMA Technologie AG Page 44 SBTLHCMS IEN080411 Installation Guide...
Страница 46: ...Inspection of the Electronic Solar Switch SMA Technologie AG Page 46 SBTLHCMS IEN080411 Installation Guide...
Страница 60: ...The Communications Interface SMA Technologie AG Page 60 SBTLHCMS IEN080411 Installation Guide...
Страница 63: ......