10 Troubleshooting
Proceed as follows to check each string in the PV plant for earth faults.
1. Disconnect the inverter from all voltage sources (see section 9).
2. Measure the voltages:
• Measure the voltages between the positive pole and the earth potential (PE).
• Measure the voltages between the negative pole and the earth potential (protective
conductor).
• Measure the voltages between the positive and negative pole.
If the following results are present at the same time, there is an earth fault in the PV plant.
– All measured voltages are stable.
– The sum of the two voltages against the earth potential is approximately equal to the voltage
between the positive and negative poles.
• Determine the location of the earth fault via the ratio of the two measured voltages.
• Eliminate the earth fault.
If there is no earth fault and the message is still displayed, contact the SMA Service Line.
Example: Location of the earth fault
The example shows an earth fault between the second and third PV module.
3. Recommission the inverter (see section 8 "Commissioning", page 51).
Содержание 10000TL
Страница 2: ......
Страница 6: ...Table of Contents SMA Solar Technology AG 6 SMC9 11TLRP IA en 51 Installation Manual ...
Страница 94: ......
Страница 95: ......
Страница 96: ...ZZZ 60 6RODU FRP 60 6RODU 7HFKQRORJ ...