Installation Manual
SMC9-11TLRP-IA-en-51
81
SMA Solar Technology AG
11 Decommissioning
1. Remove the cable glands from the inverter.
2. Remove the ESS.
3. Pack the inverter, cable glands and ESS. Use the original packaging or packaging that is suitable
for the weight and dimensions of the inverter (see section 12 "Technical Data", page 82).
• Dispose of the inverter in accordance with the locally applicable disposal regulations for
electronic waste.
or
Return the inverter at your own cost to SMA Solar Technology AG (see section 14 "Contact",
page 92). Label the package "ZUR ENTSORGUNG" ("FOR DISPOSAL").
7. Loosen the screws between the inverter and the
wall mounting bracket on both sides.
8. If the inverter is protected against theft, loosen
the safety screws.
9. Remove the inverter by lifting it up vertically and
out of the wall mounting bracket. Use the side
recessed grips or a steel rod (diameter: maximum
30 mm). Transport the inverter horizontally.
11.2 Packing the Inverter
11.3 Disposing of the Inverter
Содержание 10000TL
Страница 2: ......
Страница 6: ...Table of Contents SMA Solar Technology AG 6 SMC9 11TLRP IA en 51 Installation Manual ...
Страница 94: ......
Страница 95: ......
Страница 96: ...ZZZ 60 6RODU FRP 60 6RODU 7HFKQRORJ ...