
38
6461
2
2022
-
SPS-B
MG_0235
Electrical Installation
Example of S-Link wiring with Stabilizers and HYD
Thrusters.
You need:
2 x 6 1327 End terminators
7 x 6 1326 T-connectors
1 x 6 1328 Power spur
4 x 6 1320-xxM Backbone cables
6 x 6 1321-xxM Spur cables
Recomended Panel: PJC221/222
(NB: Each Panel/S-link unit must have its own
T-connector and spur cable.)
The yellow wire(shield) in the Power spur must be
connected together with the black wire to Battery
minus as in the drawing below.
Power
Supply
Cable
Red
Black
Yellow
5A
+12/24V
S-link supply
Electrical Installation
VFD:
Mount the VFD relatively close to the PHC-3 controller(Power pack/Rack/Tank/AC motor), within 4 meters.
Harness: #160311-050
(NB: VFD must be protected from any water spray.)
MC_0218
IMPORTANT
Follow the installation guidelines from the VFD manual supplied with the system.
Содержание STABILISER 66B
Страница 66: ...66 6461 2 2022 SPS B MC_0037 Notes ...
Страница 67: ...67 6461 2 2022 SPS B MC_0037 Notes ...