
31
6461
2
2022
-
SPS-B
Electrical Installation
Mounting the SCU:
Mount the SCU on a bulkhead perpendicular to the keel, as central as possible in the boat (so it moves as little as possible). A typical location is the
forward or aftward engine room bulkhead. It must be installed with the cable outlet facing DOWN - the direction if it is mounted facing forward or aft, a
setting stating the direction is done in the control panel during setup.
Mounting the FCU:
Mount the FCU close to the actuator and fi n valve unit.
MC_0218
IMPORTANT
The mounting area MUST be vibration free.
MG_0230
Mounting the SCU
Mounting the FCU
Electrical Installation
Mounting the Control Panel:
The main operating panel can be fi tted on the dashboard(s) from the front using four screws with a smooth plastic cover. Or, it can be “flush
mounted” by rear-fi tting using studs or other solutions. The Stabilizer operating panel is a 4,3” sunlight-readable touch panel, that is used for
setup and operation of the stabilizer system as well as other parts of the S-link system.
MC_0218
MG_0231
Gasket between the dashboard and
back surface of the panel.
Studs
Gasket
Front Mounting
(Top View)
Rear Mounting
(Bottom View)
132.76 mm
151 mm
70.76 mm
86.76 mm
89 mm
148.76 mm
Ø16 mm
Ø3 mm X 4
4 X threaded mounting pin.
(Ø MAX 4mm)
Thickness 3.5 mm
(NB: 3.5 mm is for perfect/
flush of it of panel top
surface)
172 mm (MIN Recessed area)
110 mm (
M
IN
R
ece
ss
ed
a
rea)
Ensure access to USB plug is available. If
necessary use the included USB external
plug with cable to extend the USB port.
(NB: This must only be used for upgrading
the panel, not as power supply to other
USB devices.)
Содержание STABILISER 66B
Страница 66: ...66 6461 2 2022 SPS B MC_0037 Notes ...
Страница 67: ...67 6461 2 2022 SPS B MC_0037 Notes ...