
2
4522
15
2021
-
SEP50
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
MC_0020
Contents
Products
SEP50/140S-12V - SEP50 Tunnel thruster, 12v
SEP50/140S-24V - SEP50 Tunnel thruster, 24v
MC_0031
General Installation Considerations and Precautions for Electric Thrusters
• The thruster must NOT be installed in compartments that require ignition proof electric equipment. If necessary, make a separate compartment.
(NB: Ignition Protected systems are tested to be installed in areas with possible explosive gases in accordance with ISO 8846)
• When installing the thruster electro motor in small compartments, ensure the compartment is well ventilated to allow for cooling of the electro
motor.
• If the height of the room you are installing the thruster is limited, the thruster can be installed horizontally or at any angle in-between.
- If the electro motor is positioned more than 30 degrees off vertical, it must be supported separately.
- Beware of keeping installation within advised measurements. No part of the propeller or gear house must be outside the tunnel.
• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking
with the boat builder this can be done safely.
• The electro motor, components and cables must be mounted so they remain dry at all times.
• We advise painting the gear house and propellers with anti-fouling.
(NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)
• Do not fi nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-
fouling between the tunnel and the props.
• Don’t install the electro motor close to easily flammable objects or equipment as it will reach over 100°C before the temperature switch is activated.
• Do not store items close to the thruster motor. Any loose items near the thruster motor is a potential fi re hazard and can cause undesired short-
circuiting.
• Do not lift it by internal cable connections, main terminals.
• The thruster power supply circuit must include the recommended sized fuse and a battery isolation switch.
MC_0425
General Installation Considerations and Precautions for Thrusters
• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking
with the boat builder this can be done safely.
• We advise painting the gear house and propellers with anti-fouling.
(NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)
• Do not fi nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-
fouling between the tunnel and the props.
• Never run the thruster out of water.
• The electro/ hydrulic motor must be handled with care. Do not place down the motor on the drive shaft.
Installation Manual
Responsibility of the installer ..............................................................................................................................................................3 - 4
Thruster Measurements ....................................................................................................................................................................... 5
Thruster Specifications
........................................................................................................................................................................... 6
Technical Specifications
....................................................................................................................................................................... 6
Proportional Technicial Specifications
.....................................................................................................................................................6
Positioning of the tunnel / thruster .......................................................................................................................................................... 7
Tunnel Length ......................................................................................................................................................................................... 8
Tunnel installation in sail boats ............................................................................................................................................................... 9
Water Deflection
................................................................................................................................................................................... 10
Tunnel ends .......................................................................................................................................................................................... 11
Tunnel installation .......................................................................................................................................................................... 12 - 13
Stern tunnel installation ........................................................................................................................................................................ 14
Gear Leg & Motor Bracket Installation.................................................................................................................................................. 15
Propeller Installation ............................................................................................................................................................................. 16
Motor Installation .................................................................................................................................................................................. 17
Thruster Electrical Installation .............................................................................................................................................................. 18
Electrical Specifications
....................................................................................................................................................................... 19
Technical Wiring Diagram .................................................................................................................................................................... 20
S-Link System Description ....................................................................................................................................................................21
Control Panel Cable Installation .......................................................................................................................................................... 22
Control Panel Installation ..................................................................................................................................................................... 23
Pre-delivery Checklist .......................................................................................................................................................................... 24
Service and Support........................................................................................................................................................................... 25
Product Spare Parts and Additional Resources .............................................................................................................................. 25
Warranty Statement ............................................................................................................................................................................ 25
Содержание SEP50
Страница 26: ...26 4522 15 2021 SEP50 MC_0037 Notes...
Страница 27: ...27 4522 15 2021 SEP50 MC_0037 Notes...