Sleipner SEP50 Скачать руководство пользователя страница 15

 15

4522

15

2021

-

SEP50

For

 Stern Thruster

 installation please refer to the supplied manual in your Sleipner product delivery

Stern Thruster  

SLEIPNER AS

P.O. Box 519
N-1612  Fredrikstad
Norway
www.sleipnergroup.com

DOCUMENT ID:

REVISION:

DATE:

LANGUAGE:

Installation Guide

Stern Tunnel Installation

MC_0003

MC_0001

Gear Leg & Motor Bracket Installation

!

 Please refer to the graphic for special considerations relating to your model 

!

1.     Mark the tunnel centreline and the boat’s centreline. 

(NB: Install the gear leg and propeller as shown above for the thrust direction to correspond 

with the control panel. Position gear leg with the P-mark facing port and the S-mark facing starboard.)

2.     Use the gasket or template (recommended) to mark the hole centres and double-check the measurements. The centre hole MUST be placed 

using the boat centreline as shown above. 

(NB: All holes must be in-line with the tunnels’ centreline for correct installation, clearance between 

the propeller and the tunnel is minimal.)    

3.     Smooth the surface of the tunnel. A rough surface will cause possible failure/movement of the gear leg. The motor bracket must rest steadily on 

the tunnel.

4.     Drill the main centre hole followed by the two screw-holes.

5.     Place the gear leg (without the propeller) with the gasket on inside the tunnel. Place the propeller on the gear leg to ensure it is centred and 

rotates freely with the same clearance from each blade to the tunnel wall. Place top motor bracket to measure the drive shaft has come through 

the motor bracket at the correct height. Remove the gear leg and propeller for fi nal installation.

6.      Apply appropriate sealant to both sides of the gasket and place on the gear leg. Place the gear leg in the tunnel (without the propeller). 

7.     Install the top motor bracket and gear leg gently together. Use appropriate sealant to ensure that no leakages occur. 

(NB: See your sealant data 

sheet for the correct application process.)

8.     Fasten the gear leg and the motor bracket with the bolts provided. Fasten to torque as shown above.

MG_0027

Tunnel 

centre line

Boats

centre line

Bow

Stern

1

STARBOARD

B

OW

Tunnel 

centre line

Boats

centre line

B

ØC

ØA

Measurement 

Description

mm

inch

ØA

30

1.18

B

23

0.91

ØC

9

0.35

SE

*P*IP

 50

SE

*P*IP

 60

B

OW

B

OW

Place top motor 

bracket and bolt plate 

Measure the drive 

shaft has come 

through the motor 

bracket at the correct 

height with the 

template supplied. 

Gasket

Ensure propeller 

turns without 

obstruction 

Motor bracket

Bolt plate

5

BOW

BOW

Apply MS Polymer 

sealant or equal to 

both sides of the 

gasket

Motor bracket 

IMPORTANT

Do not apply sealant to 

the holes.

6 - 7

2 - 4

8

Fasten bolts

18Nm (13.28 lb/ft)  

*P- Propositional 
*IP- Ignition Protected

Содержание SEP50

Страница 1: ...SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Pro DC Electric Thruster Models SEP50 EN I M 4522 15 2021...

Страница 2: ...s 6 Positioning of the tunnel thruster 7 Tunnel Length 8 Tunnel installation in sail boats 9 Water Deflection 10 Tunnel ends 11 Tunnel installation 12 13 Stern tunnel installation 14 Gear Leg Motor Br...

Страница 3: ...to ensure necessary familiarity with the product before installation Instructions in this document cannot be guaranteed to comply with all international and national regulations It is the responsibil...

Страница 4: ...ducts In case of connecting third party equipment it must always be connected through a Sleipner supplied interface product Any attempt to directly control or connect into the S Link control system wi...

Страница 5: ...WD Water Depth 140 5 51 140 5 51 TL Minimum tunnel length 124 4 88 124 4 88 TL recommended Recommended tunnel length 152 5 98 152 5 98 T min Minimum tunnel wall thickness 5 0 20 5 0 20 T max Maximum t...

Страница 6: ...ss thread inserts Tunnel Cross spun with rowing G R P tunnel Steel aluminium tunnels available at request Propeller 5 blade skewback Q prop propeller breglass reinforced composite Batteries Minimum re...

Страница 7: ...ep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during operat...

Страница 8: ...the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby the th...

Страница 9: ...he tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in the...

Страница 10: ...ngled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will pu...

Страница 11: ...nd thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled tunn...

Страница 12: ...e back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to the a...

Страница 13: ...nstalled and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible round t...

Страница 14: ...tion please refer to the supplied manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Ins...

Страница 15: ...with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propeller...

Страница 16: ...he propeller until the drive pin aligns with the internal slot in the propeller 2 Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Apply anti fouling to the gear...

Страница 17: ...lation later 3 If you are installing the motor at an angle of more than 30 degrees off vertical the motor will require separate additional support NB Do not position supports on the motors top cap 4 F...

Страница 18: ...ical operation of the vessel when not on board or in emergencies NB It is advised to install a fuse on the positive cable for protection against short circuiting of the main cables The fuse should ens...

Страница 19: ...AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2 x 3...

Страница 20: ...4522 15 2021 SEP50 MG_0062 Technical Wiring Diagram A1 A2 D2 NTC Thruster motor D1 1 2 3 4 5 6 7 8 To PPC B To PPC M Multi cable to PPC grey blue white red pink Opt 8 Way connector C C red or red bro...

Страница 21: ...ll be connected to GND and the red wire connected to 12VDC or 24VDC To reduce the risk of interference avoid routing the S Link cables close to equipment such as radio transmitters antennas or high vo...

Страница 22: ...ack red B B 05M 05M 5A 12 24 5A 12 24 PPC PJC 212 Proportional joystick control panel Bow and stern Station 1 S PJC 212 Observe PPC battery terminal polarity S S 12 24V 5A S link on off switch red yel...

Страница 23: ...For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISIO...

Страница 24: ...use and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened wel...

Страница 25: ...to the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding that...

Страница 26: ...26 4522 15 2021 SEP50 MC_0037 Notes...

Страница 27: ...27 4522 15 2021 SEP50 MC_0037 Notes...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Отзывы: