Sleipner SEP100 Скачать руководство пользователя страница 20

20

2728

13

2021

-

SEP 80 & 100 & 120 & 130 & 150

MC_0120

S-link Planning & Precautions

EN

S-link is a ”CAN” based control system with full intelligent communication between all units in the system. 

Main advantages include:

- Round, compact and waterproof plugs with unique keying and colour coding to avoid faulty hookup.

- An unlimited number of commands or information transfer on a single cable.

- Proprietary Sleipner commands but built 100% on NMEA 2000 standard.

Routing the Backbone:

Keep routing backbone spur cables to a minimum. Avoid routing the S-link cables close to equipment that might cause interference to the S-link 

signals such as radio transmitter equipment, antennas or high voltage cables. The backbone MUST be terminated at each end with the 6 1327 End

Terminator.

Spur cables:

Spur cables can be left not terminated 

(NB: Routing can be prepared for future additional equipment)

. Make sure to protect open connectors from

water and moisture to avoid corrosion in the connectors.

MG_0159

S1=_____

BB1=___

BB2=___

S2=_____

Positive, Negative 

& Shield

Example of the control wiring 

with  S-link system for boats 

with one control position and 

one thruster. 

Bow Thruster

Automatic 

Main switch

BACKBONE Cable

Forms the main 

“loop” around the 

boat.

SPUR Cable

Must be used to connect all 

parts to the backbone cable 

(One for each component, no 

exceptions). Recommended to 

be as short as practically 

possible.  

POWER Cable

Must be one in each 

system, length 2.5m

4-Port T Connector

The 4-port T-connector allows multiple spur cables to be 

connected. 

(NB: Comes with two sealing caps to protect.)

T- Connector

Must be one for each spur, 

including power cable 

BACKBONE extender

Connects two BACKBONE 

cables to extend length.

END terminator

Must be one for each end 

of the BACKBONE “loop”.

Power Supply

Control Panel

You need:

2 x 6 1327 End terminators

3 x 6 1326  T-connectors

1 x 6 1328 Power spur

2 x 6 1320-xxM Backbone cables

2 x 6 1321-xxM  Spur cables

Thruster

Control Panel

Backbone cables

Forms the main ”loop” around the boat

Part #: 6 1320-xxM (xx=length)

0,2 m

2,0 m

4,0 m

7,0 m

15,0 m

20,0 m

Spur cables

Must be used to connect all parts to the backbone cable (one for each component, no 

exeptions), recommended to be as short as practically possible

Part #: 6 1321-xxM (xx=length)

0,4 m

1,0 m

3,0 m
5,0 m

Power cable (spur)

Must be one in each system,

delivered in the length of 2,5m

Part #: 6 1328

T-connector

Must be one for each spur,

including the power cable

Part #: 6 1326

End terminator

Must be one in each end 

of the backbone ”loop”
Part #: 6 1327

S-link cable parts

Control

panel

Power 

supply

Automatic

mainswitch

Bow

thruster

Example of wiring

Wiring of S-link system 

Explaining S-link

S-link is a ”CanBus” based control system

with full intelligent communication

between all units in the system, much like

a computer network.

Main advantages include:

-

Round, compact and waterproof plugs with 

unique keying to avoid faulty hookup

-

Unlimited number of commands or information 

transfer on a single cable

-

Proprietary Sleipner commands, but built 100% 

on NMEA 2000 standard

Control Panel Cable Installation

EN

•  

All Sleipner control panels can be used in any combination. 

•  

All control panels can be installed using:

 

• Y-connectors - for standard on/off 

• T-connectors - for S-link proportional power system. 

(NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until 

it receives a single signal or thrust in one direction.)

• 

Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup.

See the Control panel manual for more information.

MC_0041

!

 Please refer to the graphic for special considerations relating to your model 

!

MG_0023

-

-

(SEP model)

-

black

black

+

red

B+

+

red

B+

black

+

red

B+

-

+

-

black

black

+

red

B+

+

red

B+

black

+

red

B+

-

+

B+

-05M

-05M

5A

+12/24

5A +12/24

PPC

PJC 212

Proportional

joystick

control panel

Bow and stern

Station 1

 

 

S-

PJC 212

Observe PPC battery 

terminal polarity !

S-

S-

+12/24V

5A

S link on/off

switch

red

ye

llo

w

bl

ack

12/24V

12/24V

Stern thruster

battery

Bow thruster

battery

Bow thruster

Stern thruster

(SEP model)

black

red

B+

black

red

Fixed multicable 5m/ 6 1280

5A

+12/24

5A +12/24

PPC

Proportional

Power Controller

Proportional

Power Controller

Automatic Main Switch

8977 12 / 8977 24

or

Manual main switch

w/ANL fuse

Automatic Main Switch

8977 12 / 8977 24

or

Manual main switch

w/ANL fuse

link control system

End terminator

End terminator

link supply

link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

Proportional

joystick

control panel

Bow and stern

Station 2

8730

8730

-

-

(SEP model)

-

black

black

+

red

B+

+

red

B+

black

+

red

B+

-

+

-

black

black

+

red

B+

+

red

B+

black

+

red

B+

-

+

B+

-05M

-05M

5A

+12/24

5A +12/24

PPC

PJC 212

Proportional

joystick

control panel

Bow and stern

Station 1

 

 

S-

PJC 212

Observe PPC battery 

terminal polarity !

S-

S-

Fixed multicable 5m/ 6 1280

+12/24V

5A

S link on/off

switch

red

ye

llo

w

bl

ack

12/24V

12/24V

Stern thruster

battery

Bow thruster

battery

Bow thruster

Stern thruster

(SEP model)

black

red

B+

black

red

Fixed multicable 5m/ 6 1280

Fixed multicable 5m/ 6 1280

5A

+12/24

5A +12/24

PPC

Proportional

Power Controller

Proportional

Power Controller

Automatic Main Switch

8977 12 / 8977 24

or

Manual main switch

w/ANL fuse

Automatic Main Switch

8977 12 / 8977 24

or

Manual main switch

w/ANL fuse

link control system

End terminator

End terminator

link supply

link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

Proportional

joystick

control panel

Bow and stern

Station 2

8730

8730

Содержание SEP100

Страница 1: ...AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Pro DC Electric Thruster Models SEP80 SEP100 SEP120 SEP130 SEP150 EN I M 2728...

Страница 2: ...nel installation 13 Thruster Installation Instructions Thruster Installation Considerations and Precautions 14 Gear Leg Motor Bracket Installation 15 Propeller Installation 16 Motor Installation 17 Th...

Страница 3: ...special national regulations Instructions in this guide cannot be guaranteed to comply with global electric mechanic regulations classi cation rules Follow all health and safety laws in accordance wit...

Страница 4: ...ommended Recommended tunnel length 216 8 50 216 8 50 216 8 50 216 8 50 276 10 87 303 11 93 303 11 93 T min Minimum tunnel wall thickness 6 0 24 6 0 24 6 0 24 6 0 24 7 0 28 7 0 28 7 0 28 T max Maximum...

Страница 5: ...all bearing at propeller shaft and a combination of ball bearing and slide bearing at drive shaft Pre lled and sealed for life Motor bracket Glass bre reinforced composite material Brass thread insert...

Страница 6: ...ster as deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels dur...

Страница 7: ...not allow the variable length of the tunnel walls to vary in length excessively EG the top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce th...

Страница 8: ...nstead t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thrus...

Страница 9: ...it is angled slightly down because of the water flow on this area 2 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoile...

Страница 10: ...e tunnel and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls a...

Страница 11: ...l cover the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglas...

Страница 12: ...h tunnel installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possib...

Страница 13: ...nstallation please refer to the supplied manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGU...

Страница 14: ...special national regulations Instructions in this guide cannot be guaranteed to comply with global electric mechanic regulations classi cation rules Follow all health and safety laws in accordance wit...

Страница 15: ...e clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propeller for nal ins...

Страница 16: ...he end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of the propeller and tighten the anode holding screw Apply a thread glue Loctite 243 or similar to ensure t...

Страница 17: ...bracket with the above torque 4 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can be hard due to the gear reduction and the motor however the propeller must b...

Страница 18: ...the electrical operation of the vessel when not on board or in emergencies NB It is advised to install a fuse on the positive cable for protection against short circuiting of the main cables The fuse...

Страница 19: ...0 NA NA NA AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0...

Страница 20: ...al Power Controller Automatic Main Switch 8977 12 8977 24 or Manual main switch w ANL fuse Automatic Main Switch 8977 12 8977 24 or Manual main switch w ANL fuse link control system End terminator End...

Страница 21: ...d to be as short as practically possible POWER Cable Must be one in each system length 2 5m 4 Port T Connector The 4 port T connector allows multiple spur cables to be connected NB Comes with two seal...

Страница 22: ...22 2728 13 2021 SEP 80 100 120 130 150 MG_0062 Technical Wiring Diagram EN...

Страница 23: ...lation EN For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT...

Страница 24: ...he gear house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tig...

Страница 25: ...ed to the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding tha...

Страница 26: ...26 2728 13 2021 SEP 80 100 120 130 150 MC_0037 Notes EN...

Страница 27: ...27 2728 13 2021 SEP 80 100 120 130 150 MC_0037 Notes EN...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Отзывы: