Sleipner Pro DC SEP210 Скачать руководство пользователя страница 15

 15

2713

20

2022

-

SEP 210

For

 Stern Thruster

 installation please refer to the supplied manual in your Sleipner product delivery

Stern Thruster  

SLEIPNER AS

P.O. Box 519
N-1612  Fredrikstad
Norway
www.sleipnergroup.com

DOCUMENT ID:

REVISION:

DATE:

LANGUAGE:

Installation Guide

For DC Electric

 

Thruster Models

SE80, SE100, SE120, SE130, SE150

EN

I M

222222
1
2018

Stern Tunnel Installation

MC_0003

MC_0001

Gear Leg & Motor Bracket Installation

!

 Please refer to the graphic for special considerations relating to your model 

!

1.     Mark the tunnel centreline and the boat’s centreline. 

(NB: Install the gear leg and propeller as shown above for the thrust direction to correspond 

with the control panel. Position gear leg with the P-mark facing port and the S-mark facing starboard.)

2.     Use the gasket or template (recommended) to mark the hole centres and double-check the measurements. The centre hole MUST be placed 

using the boat centreline as shown above. 

(NB: All holes must be in-line with the tunnels’ centreline for correct installation, clearance between 

the propeller and the tunnel is minimal.)    

3.     Smooth the surface of the tunnel. A rough surface will cause possible failure/movement of the gear leg. The motor bracket must rest steadily on 

the tunnel.

4.     Drill the main centre hole followed by the two screw-holes.

5.     Place the gear leg (without the propeller) with the gasket on inside the tunnel. Place the propeller on the gear leg to ensure it is centred and 

rotates freely with the same clearance from each blade to the tunnel wall. Place top motor bracket to measure the drive shaft has come through 

the motor bracket at the correct height. Remove the gear leg and propeller for fi nal installation.

6.      Apply appropriate sealant to both sides of the gasket and place on the gear leg. Place the gear leg in the tunnel (without the propeller). 

7.     Install the top motor bracket and gear leg gently together. Use appropriate sealant to ensure that no leakages occur. 

(NB: See your sealant data 

sheet for the correct application process.)

8.     Fasten the gear leg and the motor bracket with the bolts provided. Fasten to torque as shown above.

MG_0055

PORT

STARBOARD 

S

SE

*P*IP 

80 

SE

*P*IP 

100

   FASTEN

   18 Nm

   (13.28 lb/ft)

SE

*P*IP 

120

SE

*P*IP 

130

SE

*P*IP 

150

SE

*P*IP 

170

SE

*P*IP 

210

   FASTEN

   33 Nm

   (24 lb/ft)

Tunnel 

centre line

Boats

centre line

Bow

Stern

1

STARBOARD

PORT

B

OW

Measurement 

Description

mm

inch

ØA

34

1.33

B

28

1.1

ØC

9

0.35

SE

*P*IP

 80

SE

*P*IP

 100

*P- Propositional 
*IP- Ignition Protected

mm

inch

47

1.85

40

1.57

12

0.43

SE

*P*IP

 120

SE

*P*IP

 130

SE

*P*IP

 150

SE

*P*IP

 170

SE

*P*IP

 210

Gasket

Ensure propeller 

turns without 

obstruction 

5

BOW

BOW

BOW

Apply MS Polymer 

sealant or equal to 

both sides of the 

gasket

Motor bracket 

IMPORTANT

Do not apply sealant to 

the holes.

6 - 7

2 - 4

8

Tunnel 

centre line

Boats

centre line

B

ØC

ØA

B

OW

Содержание Pro DC SEP210

Страница 1: ...SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Pro DC Electric Thruster Models SEP210 EN I M 2713 20 2022...

Страница 2: ...he tunnel thruster 7 Tunnel Length 8 Tunnel installation in sail boats 9 Water Deflection 10 Tunnel ends 11 Tunnel installation 12 13 Stern tunnel installation 14 Gear Leg Motor Bracket Installation 1...

Страница 3: ...in this document cannot be guaranteed to comply with all international and national regulations It is the responsibility of the installer to follow all applicable international and national regulatio...

Страница 4: ...connected through a Sleipner supplied interface product Any attempt to directly control or connect into the S Link control system without a designated and approved interface will render all warrantie...

Страница 5: ...79 WD Water Depth 250 9 84 TL Minimum tunnel length 273 10 75 TL recommended Recommended tunnel length 323 12 72 T min Minimum tunnel wall thickness 7 0 28 T max Maximum tunnel wall thickness 9 0 35 2...

Страница 6: ...re information Max use 2 3 min duty cycle at 20 C Safety features Electronic time lapse device protects against sudden change of drive direction The electric thermal cut off switch in electro motor pr...

Страница 7: ...eep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during opera...

Страница 8: ...f the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby the t...

Страница 9: ...the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in th...

Страница 10: ...angled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will p...

Страница 11: ...and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled tun...

Страница 12: ...he back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to the...

Страница 13: ...installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible round...

Страница 14: ...in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For DC Electric Thruster...

Страница 15: ...ce from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propeller for nal installation...

Страница 16: ...he propeller 2 Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of the propeller and tighten the anode holding screw Apply a thread gl...

Страница 17: ...ith the above torque 4 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can be hard due to the gear reduction and the motor however the propeller must be able to...

Страница 18: ...peration of the vessel when not on board or in emergencies NB It is advised to install a fuse on the positive cable for protection against short circuiting of the main cables The fuse should ensure no...

Страница 19: ...2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2 x 3 0 100 1...

Страница 20: ...2713 20 2022 SEP 210 MG_0062 Technical Wiring Diagram A1 A2 D2 NTC Thruster motor D1 1 2 3 4 5 6 7 8 To PPC B To PPC M Multi cable to PPC grey blue white red pink Opt 8 Way connector C C red or red br...

Страница 21: ...connected to 12VDC or 24VDC To reduce the risk of interference avoid routing the S Link cables close to equipment such as radio transmitters antennas or high voltage cables The backbone must be termi...

Страница 22: ...lack red B B 05M 05M 5A 12 24 5A 12 24 PPC PJC 212 Proportional joystick control panel Bow and stern Station 1 S PJC 212 Observe PPC battery terminal polarity S S 12 24V 5A S link on off switch red ye...

Страница 23: ...For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISI...

Страница 24: ...ouse and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened we...

Страница 25: ...the defect to the best of the Claimant s knowledge including product identi cation and serial nbr the date and place of purchase and the name and address of the installer Proof of purchase date should...

Страница 26: ...26 2713 20 2022 SEP 210 MC_0037 Notes...

Страница 27: ...27 2713 20 2022 SEP 210 MC_0037 Notes...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Group cannot accept liability for any possible differences...

Отзывы: