
14
2713
20
2022
-
SEP 210
For
Stern Thruster
installation please refer to the supplied manual in your Sleipner product delivery
Stern Thruster
SLEIPNER AS
P.O. Box 519
N-1612 Fredrikstad
Norway
www.sleipnergroup.com
DOCUMENT ID:
REVISION:
DATE:
LANGUAGE:
Installation Guide
For DC Electric
Thruster Models
SE80, SE100, SE120, SE130, SE150
EN
I M
222222
1
2018
Stern Tunnel Installation
MC_0003
MG_0055
PORT
STARBOARD
S
P
SE
*P*IP
80
SE
*P*IP
100
FASTEN
18 Nm
(13.28 lb/ft)
SE
*P*IP
120
SE
*P*IP
130
SE
*P*IP
150
SE
*P*IP
170
SE
*P*IP
210
FASTEN
33 Nm
(24 lb/ft)
Tunnel
centre line
Boats
centre line
Bow
Stern
1
STARBOARD
PORT
B
OW
Measurement
Description
mm
inch
ØA
34
1.33
B
28
1.1
ØC
9
0.35
SE
*P*IP
80
SE
*P*IP
100
*P- Propositional
*IP- Ignition Protected
mm
inch
47
1.85
40
1.57
12
0.43
SE
*P*IP
120
SE
*P*IP
130
SE
*P*IP
150
SE
*P*IP
170
SE
*P*IP
210
Gasket
Ensure propeller
turns without
obstruction
5
BOW
BOW
BOW
Apply MS Polymer
sealant or equal to
both sides of the
gasket
Motor bracket
IMPORTANT
Do not apply sealant to
the holes.
6 - 7
2 - 4
8
Tunnel
centre line
Boats
centre line
B
ØC
ØA
B
OW
Содержание Pro DC SEP210
Страница 26: ...26 2713 20 2022 SEP 210 MC_0037 Notes...
Страница 27: ...27 2713 20 2022 SEP 210 MC_0037 Notes...