
2
7241
5
2022
-
ERV130 & ERV170 & ERV210
MC_0474
For retract thrusters
• Stern mounted retract thrusters must not be installed to conflict with the main boat propellers or its water trail.
(NB: consult a naval architect for
an exact position.)
When installing an S-Link™ system DO NOT connect any other control equipment directly to the S-Link™ bus except original Sleipner S-Link™ products.
In case of connecting third-party equipment, it must always be connected through a Sleipner-supplied interface product.
Any attempt to directly control or connect into the S-Link™ control system without a designated and approved interface will render all warranties and
responsibilities of all of the connected Sleipner products.
If you are interfacing the S-Link™ bus by agreement with Sleipner through a designated Sleipner supplied interface, you are still required to install at
least one original Sleipner control panel to enable efficient troubleshooting if necessary.
MC_0105
MC_0425
For thruster systems
• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking
with the boat builder this can be done safely.
• We advise painting the gear house and propellers with anti-fouling.
(NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)
• There is only room for a thin coat of primer and two layers of anti-fouling between the tunnel and the props.
• Never run the thruster out of water.
MC_0502
Lithium Batteries for proportional thrusters models SEP, SEP-IP and eVision
• If a lithium battery system is installed for supply of SEP, SEP-IP or eVision thrusters, make sure the battery is designed for continuous supply of the
required thruster current. Under-rated battery management system can suddenly disconnect the load which may lead to dangerous situations. The
fi rmware version of Proportional Power Controller (PPC) must be of version 1.033 or later if the PPC is to be connected to a lithium battery.
Operating the thruster outside specifi ed ratings will void warranty.
NEVER Disassemble any part of the Ignition Protected assembly. Tampering with the Ignition Protected assembly will cause it to lose this
safety feature. If there is a problem with your Ignition Protected motor, please contact your dealer.
MC_0007
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
MC_0020
Contents
Products
ERV130/250T-24V - ERV130 eVision retract bow/stern thruster 24V
ERV130/250T-48V - ERV130 eVision retract bow/stern thruster 48V
ERV170/250TC-24V - ERV170 eVision retract bow/stern thruster 24V
ERV170/250TC-48V - ERV170 eVision retract bow/stern thruster 48V
ERV210/250TC-24V - ERV210 eVision retract bow/stern thruster 24V
ERV210/250TC-48V - ERV210 eVision retract bow/stern thruster 48V
Installation Manual
Responsibility of the Installer ....................................................................................................................................................................
3
General Installation Considerations and Precautions Guidelines ............................................................................................................
3
Product Measurements ............................................................................................................................................................................ 4
Product Specifications
................................................................................................................................................................................ 5
Positioning of the Retract thruster ............................................................................................................................................................. 6
Preparing a Sandwich Hull for Retract Systems ........................................................................................................................................ 7
Marking and Trimming of SRF Flange ........................................................................................................................................................ 8
Installation Pre-check ................................................................................................................................................................................ 9
Required Modifications After Pre-check
.................................................................................................................................................. 10
SRF Flange Installation ............................................................................................................................................................................ 11
Motor House Installation .......................................................................................................................................................................... 12
Hatch Installation .....................................................................................................................................................................................
13
Motor to House Installation ..................................................................................................................................................................... 14
Electrical Installation ............................................................................................................................................................................... 15
Electrical Reference Guide ....................................................................................................................................................................... 16
Wiring Diagram 24V Retract Thruster ...................................................................................................................................................... 17
Wiring Diagram 48V Retract Thruster ...................................................................................................................................................... 18
S-Link System Description ....................................................................................................................................................................... 19
Check drive shaft alignment ..................................................................................................................................................................... 20
Calibrate drive shaft alignment ................................................................................................................................................................ 20
Actuator Configuration
............................................................................................................................................................................. 20
LED Indication .......................................................................................................................................................................................... 20
Control Panel Installation ....................................................................................................................................................................... 21
Pre-delivery Checklist ........................................................................................................................................................... 22
Service and Support ............................................................................................................................................................... 23
Product Spare Parts and Additional Resources ....................................................................................................................... 23
Warranty Statement ............................................................................................................................................................... 23
CE Declaration of Conformity .................................................................................................................................................. 24
UK Declaration of Conformity .................................................................................................................................................. 25