2
7240
6
2022
-
E300
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
MC_0020
Contents
Products
ERV300/300TC-48V - ERV300 eVision retract bow/stern thruster 48V
MC_0452
For Sleipner eVision electric motors
• The thruster must NOT be installed in compartments that require ignition proof electric equipment. If necessary, make a separate compartment.
(NB: Ignition Protected systems are tested to be installed in areas with possible explosive gases in accordance with ISO 8846)
• When installing the thruster electric motor in small compartments, ensure the compartment is well ventilated to allow for cooling of the electro
motor.
• If the height of the room you are installing the thruster is limited, the thruster can be installed horizontally or at any angle in-between.
- If the electro motor is positioned more than 30 degrees off vertical, it must be supported separately.
- Beware of keeping installation within advised measurements. No part of the propeller or gear house must be outside the tunnel.
• The electric motor, components and cables must be mounted so they remain dry at all times.
• Do not fi nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-
fouling between the tunnel and the props.
• Don’t install the electric motor close to easily flammable objects or equipment
• Do not store items close to the thruster motor. Any loose items near the thruster motor is a potential fi re hazard and can cause undesired short-
circuiting.
• Do not lift it by internal cable connections, main terminals.
• The thruster power supply circuit must include the recommended sized fuse and a battery isolation switch.
• The electric/ hydraulic motor must be handled with care. Do not rest the thruster motor on its drive shaft as its weight can damage the shaft.
When installing an S-Link™ system DO NOT connect any other control equipment directly to the S-Link™ bus except original Sleipner S-Link™ products.
In case of connecting third-party equipment, it must always be connected through a Sleipner-supplied interface product.
Any attempt to directly control or connect into the S-Link™ control system without a designated and approved interface will render all warranties and
responsibilities of all of the connected Sleipner products.
If you are interfacing the S-Link™ bus by agreement with Sleipner through a designated Sleipner supplied interface, you are still required to install at
least one original Sleipner control panel to enable efficient troubleshooting if necessary.
MC_0105
MC_0425
For thruster systems
• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking
with the boat builder this can be done safely.
• We advise painting the gear house and propellers with anti-fouling.
(NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)
• There is only room for a thin coat of primer and two layers of anti-fouling between the tunnel and the props.
• Never run the thruster out of water.
The installer must read this document to ensure necessary familiarity with the product before installation.
Instructions in this document cannot be guaranteed to comply with all international and national regulations. It is the responsibility of the
installer to follow all applicable international and national regulations when installing Sleipner products.
The recommendations given in this document are guidelines ONLY, and Sleipner strongly recommends that advice is obtained from a person
familiar with the particular vessel and applicable regulations.
This document contains general installation instructions intended to support experienced installers. If you are not skilled in this type of work,
please contact professional installers for assistance.
If required by local regulation, electrical work must be done by a licensed professional.
Appropriate health and safety procedures must be followed during installation.
Faulty installation of Sleipner products will render all warranties given by Sleipner Motor AS.
MC_0038
Responsibility of the Installer
Failure to follow the considerations and precautions can cause serious injury, damage and will render all
warranties given by Sleipner Motor as VOID.
MC_0411
MC_0440
General Installation Considerations and Precautions Guidelines
MC_0502
Lithium Batteries for proportional thrusters models SEP, SEP-IP and eVision
• If a lithium battery system is installed for supply of SEP, SEP-IP or eVision thrusters, make sure the battery is designed for continuous supply of the
required thruster current. Under-rated battery management system can suddenly disconnect the load which may lead to dangerous situations. The
fi rmware version of Proportional Power Controller (PPC) must be of version 1.033 or later if the PPC is to be connected to a lithium battery.
Operating the thruster outside specifi ed ratings will void warranty.
NEVER Disassemble any part of the Ignition Protected assembly. Tampering with the Ignition Protected assembly will cause it to lose this
safety feature. If there is a problem with your Ignition Protected motor, please contact your dealer.
MC_0007
Installation Manual
Responsibility of the Installer .................................................................................................................................................................... 3
General Installation Considerations and Precautions Guidelines ............................................................................................................ 3
Product Measurements ............................................................................................................................................................................ 4
Product Specifications
................................................................................................................................................................................ 5
Positioning of the tunnel / thruster ............................................................................................................................................................ 6
Tunnel Length ............................................................................................................................................................................................. 7
Tunnel Installation in Sailboats .................................................................................................................................................................. 8
Water Deflection ......................................................................................................................................................................................... 9
Tunnel Ends ............................................................................................................................................................................................. 10
Tunnel Installation ............................................................................................................................................................................ 11 - 12
Stern Tunnel Installation ......................................................................................................................................................................... 13
Gear Leg & Motor Bracket Installation .................................................................................................................................................... 14
Propeller Installation ............................................................................................................................................................................... 15
Motor Installation .................................................................................................................................................................................... 16
Electrical Installation .............................................................................................................................................................................. 17
Electrical Reference Guide ....................................................................................................................................................................... 18
Wiring Diagram 48V Thruster .................................................................................................................................................................. 19
S-Link System Description ....................................................................................................................................................................... 20
Control Panel Installation ....................................................................................................................................................................... 21
Pre-delivery Checklist ........................................................................................................................................................... 22
Service and Support ............................................................................................................................................................... 23
Product Spare Parts and Additional Resources ....................................................................................................................... 23
Warranty Statement ............................................................................................................................................................... 23
CE Declaration of Conformity .................................................................................................................................................. 24
UK Declaration of Conformity .................................................................................................................................................. 25
Содержание E-Vision Electric Thruster E300
Страница 26: ...26 7240 6 2022 E300 MC_0037 Notes...
Страница 27: ...27 7240 6 2022 E300 MC_0037 Notes...