E300
Control Panel Installation
For
Control Panel
installation please refer to the Installation Guide accompanying the control panel to be installed.
MC_0398
Control Panel
SLEIPNER MOTOR AS
P.O. Box 519
N-1612 Fredrikstad
Norway
www.sleipnergroup.com
DOCUMENT ID:
REVISION:
DATE:
LANGUAGE:
Installation Guide
MC_0120
S-Link System Description
S-Link is a CAN-based control system used for communication between Sleipner products installed on a vessel. The system uses BACKBONE Cables
as a common power and communication bus with separate SPUR Cables to each connected unit. Units with low power consumption are powered
directly from the S-Link bus therefore one power cable must be connected to the BACKBONE Cable through a T-Connector.
Main advantages of S-Link system:
- Compact and waterproof plugs.
- BACKBONE and SPUR Cables have different colour coding and keying to ensure correct and easy installation. BACKBONE Cables have blue
connectors and SPUR Cables have green connectors.
- Different cable lengths and BACKBONE Extenders makes the system scalable and flexible to install.
Installation of S-Link cables:
Select appropriate cables to keep the length of BACKBONE- and SPUR Cables to a minimum. In case of planned installation with total BACKBONE
Cable length exceeding 100 meters please consult your local distributor. The S-Link cables should be installed to ensure sharp bend radius’s is
avoided. Locking mechanism on connectors must be fully closed. To ensure long lifetime, cables, T-Connectors and Extenders should not be
located so that they are permanently immersed in water or other fluids. It is also recommended to install cables such that water and condensation do
not run along the cables and into the connectors.
The POWER Cable should ideally be connected around the middle of the BACKBONE Cable to ensure an equal voltage drop at each end of the
BACKBONE Cable. The yellow and black wire in the POWER Cable shall be connected to GND and the red wire connected to +12VDC or +24VDC.
To reduce the risk of interference, avoid routing the S-Link cables close to equipment such as radio transmitters, antennas or high voltage cables. The
backbone must be terminated at each end with the END Terminator.
SPUR cables can be left unterminated to prepare for the installation of future additional equipment. In such cases, ensure to protect open connectors
from water and moisture to avoid corrosion in the connectors.