SLEIPNER MOTOR AS SRH-240/250 TC Скачать руководство пользователя страница 7

 7

2933

6

2021

-

SH 240 & SH 320

Positioning of the Retract thruster

EN

MC_0067

The thruster must always be installed so the hatch is opened towards the direction of travel. 

Bow

The thruster must be installed as far forward as possible. Allow for 10cm around the thruster for moulding the retract frame and the depth of the 

retracted propeller is 185mm (SR 80/100), 250mm (SR 130/210) or 300mm (SR 250/300) under the waterline. For bow installations, the thruster 

must be installed in the centre line of the keel. 

(NB: Installing the thruster further forward will give less depth for the propeller but offer better 

leverage effect for turning.)

Stern

Follow the same depth requirement for the retracted propeller of 185mm (SR 80/ 100), 250mm (SR 130/ 210) or 300mm (SR 250/ 300) under the 

waterline. The thruster while retracted must not conflict with any other component of the vessel such as stern drives/ propellers, trim tabs or rudders. 

Therefore stern installations do not require to be installed on the hulls keel centre line and can be installed off centre. 

Installing the thruster below the waterline as outlined is important for two reasons:

1.    So that it does not suck air down from the surface which will reduce performance and increase noise levels. 

2.    To get as much water pressure as possible to receive maximum effi ciency from the thruster.

Always ensure enough space for the complete SR unit including motor, actuators, retract frame, future service and for installation moulding to the hull.

MG_0181

Minimum tunnel depth

SR 80 & 100      = 185mm

SR 130 & 210    = 250mm

SR 250 & 300    = 300mm

Hatch opens towards the 

direction of travel

Thruster moved to 

avoid conflict

Thruster moved to 

avoid conflict

Stern Installation

Bow Installation

WATERLINE

MC_0169

Thruster Specifi cations 

EN

 Description

* 240

* 320

Light duty thrust up to (kg * lbs)

240kg * 529lbs

320kg * 705lbs

Typical Boat Size (m * ft)

13m - 23m * 42ft - 75ft 22m - 34m * 72ft - 110ft

Propulsion System 

Twin Counter

Twin Counter

Power (kw * Hp)

14 kw * 19 hp

20 kw * 27 hp

Weight (kg * lbs)

82 kg * 180 lbs

88 kg * 194 lbs

Lubrication

Sealed

Sealed

                  

MC_0170

Technical Specifi cations

EN

Motor:

  

Hydraulic type (specifi cations above)

Gear house:

     

Seawater resistant bronze. Ball-bearing at propeller shaft and a combination of ball bearing and slide bearing at drive shaft.

Gears:

  

Hardened precision gears

Lubrication:

 

Oil bath from tank (gear oil EP 90)

Bearings:

  

Angular contact ball bearing at propeller shaft and combination of ball bearing and needle bearing at drive shaft.

Motor bracket:

      Seawater resistant aluminium, galvanically insulated from the motor.

Tunnel: 

     

Cross spun with rowing G.R.P tunnel

 

 

Steel & aluminium tunnels available at request.

Propeller:   

  

5-blade skewback “Q-prop” propeller, fi breglass reinforced composite.         

Safety:     

 

Flexible coupling between hydraulic-motor and drive shaft protects gear system if propeller jams.

   

If using the original Sleipner panel, the panel shuts off automatically 6 minutes after last use.

       

An integrated microprocessor monitors solenoids, reducing wear and risk of solenoid lock-in. Auto-stop of the thruster in case of  

 

 

accidental solenoid lock-in or if run signal is continuous for more than 3 minutes

 

 

 

Depending on the panel type after a certain time not in use, the console will shut down and retract the thruster. 

(NB: the thruster  

 

 

will retract automatically when turned off.)

Содержание SRH-240/250 TC

Страница 1: ...Made in Norway Sleipner Motor AS 2021 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com Document id Revision Date Installation Guide 2933 6 2021 SRH 240 250 TC 320 300 TC...

Страница 2: ...al Requirements Hydraulic hose connections to motor 8 Installation Instructions Hydraulic Thruster Installation Considerations and Precautions 9 Marking and Trimming of SRF Flange 10 Installation Pre...

Страница 3: ...gh space around the oil tank to change lters ll oil and inspect gauges and indicators IMPORTANT Stern mounted retract thrusters must not be installed to conflict with the main boat propellers or its w...

Страница 4: ...EN Measurement code Measurement description mm inch H Height 390 15 4 L Length 688 27 1 L Additional Length 42 1 7 W Width 481 18 9 ID Internal Diameter 250 9 80 WD Water Depth 250 9 80 RD Retract Dep...

Страница 5: ...asurements EN Measurement code Measurement description mm inch H Height 455 17 9 L Length 843 33 2 W Width 580 22 83 ID Internal Diameter 300 11 8 WD Water Depth 300 11 8 RD Retract Depth 445 17 5 RW...

Страница 6: ...and combination of ball bearing and needle bearing at drive shaft Motor bracket Seawater resistant aluminium galvanically insulated from the motor Tunnel Cross spun with rowing G R P tunnel Steel alu...

Страница 7: ...nder the waterline The thruster while retracted must not conflict with any other component of the vessel such as stern drives propellers trim tabs or rudders Therefore stern installations do not requi...

Страница 8: ...94 5 7 1987 6 4 2494 U8 L min Bar 25 5 77 29 9 103 32 3 129 USG PSI 6 6 1117 7 6 1494 8 5 1871 U10 L min Bar 31 3 62 36 1 82 40 4 103 USG PSI 8 3 899 9 5 1189 10 7 1494 SH160 U6 L min Bar 18 6 150 21...

Страница 9: ...st have flow and pressure limits that are either set within or can be adjusted to the limits of the thrusters capability We strongly advise that a shock valve is tted and set to 10 15 above the chosen...

Страница 10: ...thruster considering space required for installation operation and future maintenance 2 Mark the keel centre line on the inside of the hull Flip the SRF flange upside down and use the internal surfac...

Страница 11: ...ns fully without touching the hull If the hatch is obstructed by the hull lift the aft end of the SRF flange maintaining the reference height in front until the hatch clears the hull when opened 4 Pre...

Страница 12: ...flange and motor stable 3 Open and close the hatch multiple times to ensure Clearance from the hull and hatch while open Hatch closes flush with the hull and extra force is still transferred to the hu...

Страница 13: ...epoxy and breglass cutting or similar which laminating material is the actual boat builders responsibility Cover the upper part if grinding is necessary After moulding material have cured run the retr...

Страница 14: ...t glue is compatible with SRF and thruster case materials 2 Place the upper thruster Housing down on the SRF flange 3 Insert and fasten bolts Start with the 4 corner bolts followed by the remaining to...

Страница 15: ...excessive material before coating the hatch 9 Apply ller on to tunnel rings contact surface so the hatch will be secured properly Now re install hatch in its correct position Tighten bolts so hatch w...

Страница 16: ...peller It is required the propeller can rotate via hand power NB Rotating the propellers can be hard because of the gear reduction and the motor 4 Apply the gear leg and propeller with anti fouling de...

Страница 17: ...17 2933 6 2021 SH 240 SH 320 MG_0186 FWD DRAIN PORT A PORT B G Hydraulic connections EN MC_0174...

Страница 18: ...l tube has no loops and forms an airlock to stop the oil flow Ensure the oil tube angle is suf cient to allow oil to flow freely into the gear leg 3 Fill the oil tank with the same gear oil used in th...

Страница 19: ...th automatic main switch Setup with manual main switch Controller M 12V 5A red black yellow Terminator 120 ohm Terminator 120 ohm Retract panel Power supply cable Retract thruster Controller 6 1242 T...

Страница 20: ...e as short as practically possible POWER Cable Must be one in each system length 2 5m 4 Port T Connector The 4 port T connector allows multiple spur cables to be connected NB Comes with two sealing ca...

Страница 21: ...rusters Power supply cable red black yellow 12 24v S link supply End Terminator 120 ohm End Terminator 120 ohm Supply 12v 24v See dim table Position Sensor Crossover Valve Thruster Motor Actuator 1 Ac...

Страница 22: ...4v supply Crossover Valve Suggested supply cable dimensioning Max total length Sum of pos and neg cable 6 mm2 Fuse 25A 35A 35 50A 35 50A 24v 10m 16 8m 26 9m 42m 12v 4 2m 6 7m 10 5m 10 mm2 16 mm2 25 mm...

Страница 23: ...actuator s No 1 set to OFF when the retract has two actuators No 1 set to ON when the retract only has one actuator No 2 set to OFF when the retract does not have P8 type actuator s No 2 set to ON whe...

Страница 24: ...ur cut out is jagged or chipped use a sealant to assist the gasket 3 Place the gasket to the back face of the panel 4 Plug cables into the connectors at the rear of the control panel 5 Insert the cont...

Страница 25: ...ar house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightene...

Страница 26: ...n Manual have been complied with and that the defect remains e warranty service shall be performed only by the Warrantor or an authorized Service Centre and any attempt to remedy the defect by anyone...

Страница 27: ...27 2933 6 2021 SH 240 SH 320 MC_0037 Notes EN...

Страница 28: ...rect at the time it was published However Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain Continuous product improvement may change the product speci cation...

Отзывы: