SLEIPNER MOTOR AS SRH-240/250 TC Скачать руководство пользователя страница 25

 25

2933

6

2021

-

SH 240 & SH 320

MC_0033

Pre-delivery Checklist

EN

�.......... The bolts holding the gear house and motor bracket together are tightened correctly.

�.......... The bolts holding the motor to its bracket are tightened correctly.

�.......... All electrical connections are clean, dry and tight, and the correct cable, fuse and main  

 

   switch size.

�.......... Check that there is no electrical connection between the electro motor body and positive     

         terminal on the motor, and between the electro motor body and the negative (A1) terminal  

 

   on the motor with an ohm meter.

�.......... Anti-fouling has been applied to the gear house and propeller but NOT anodes, sealing/  

 

   rubber fi ttings or propeller shafts.

�.......... Propeller is fastened correctly to the shaft.

�.......... Propeller turns freely in tunnel.

�.......... The anode and/ or holding screw is tightened well with thread glue.

�.......... Check the boat for potential water leakage around installation areas.

�.......... Correct drive direction as per control panel.

�.......... User Manual is supplied to the owner.

The thruster has been installed as per the instructions in this manual and all points in checklist above have been controlled.

Signed: .........................................................................................

Date: .............................................................................................

Thruster type: ................................................................................................................................................................................................

Serial number:...............................................................................................................................................................................................

Date of delivery:.............................................................................................................................................................................................

Correct drive direction as per control panel: ..................................................................................................................................................

The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for  flooding: 

......................................................................................................................................................................................................................

......................................................................................................................................................................................................................

......................................................................................................................................................................................................................

Other comments by installer: ........................................................................................................................................................................

.......................................................................................................................................................................................................................

.......................................................................................................................................................................................................................

Control Panel Installation 

EN

Find a suitable location for the control panel where it does not obstruct or is obstructed by other devices. Install the control panel on a flat surface 

where it is easy to use. 

1.  Use the supplied cut-out template to mark the area to remove on your control dash. 

2.  Cut out the area per template for the control panel. (

NB: If the front surface around your cut out is jagged or chipped, use a sealant

to assist the gasket.)

3.  Place the gasket to the back face of the panel 

4.  Plug cables into the connectors at the rear of the control panel. 

5.  Insert the control panel in place and fasten screws.

6.  Insert the control panels covering caps.

MC_0042

!

 Please refer to the graphic for special considerations relating to your model 

!

MG_0063

GASKET   

4x SCREWS 

58 mm

67 mm

125 mm

116 mm

132.7 mm

75.7 mm

Ø 4.5 mm

Ø 4.5 mm

Ø 4.5 mm

Ø 4.5 mm

(S-link)

External alarm buzzer

12V / 24V DC - max 0,5A

External alarm / buzzer connection

Supply

+ 12V / 24V DC 

-

+

Ø 4.5 mm

Rear

side

of pa

nel

Internal

fuse / relay

Содержание SRH-240/250 TC

Страница 1: ...Made in Norway Sleipner Motor AS 2021 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com Document id Revision Date Installation Guide 2933 6 2021 SRH 240 250 TC 320 300 TC...

Страница 2: ...al Requirements Hydraulic hose connections to motor 8 Installation Instructions Hydraulic Thruster Installation Considerations and Precautions 9 Marking and Trimming of SRF Flange 10 Installation Pre...

Страница 3: ...gh space around the oil tank to change lters ll oil and inspect gauges and indicators IMPORTANT Stern mounted retract thrusters must not be installed to conflict with the main boat propellers or its w...

Страница 4: ...EN Measurement code Measurement description mm inch H Height 390 15 4 L Length 688 27 1 L Additional Length 42 1 7 W Width 481 18 9 ID Internal Diameter 250 9 80 WD Water Depth 250 9 80 RD Retract Dep...

Страница 5: ...asurements EN Measurement code Measurement description mm inch H Height 455 17 9 L Length 843 33 2 W Width 580 22 83 ID Internal Diameter 300 11 8 WD Water Depth 300 11 8 RD Retract Depth 445 17 5 RW...

Страница 6: ...and combination of ball bearing and needle bearing at drive shaft Motor bracket Seawater resistant aluminium galvanically insulated from the motor Tunnel Cross spun with rowing G R P tunnel Steel alu...

Страница 7: ...nder the waterline The thruster while retracted must not conflict with any other component of the vessel such as stern drives propellers trim tabs or rudders Therefore stern installations do not requi...

Страница 8: ...94 5 7 1987 6 4 2494 U8 L min Bar 25 5 77 29 9 103 32 3 129 USG PSI 6 6 1117 7 6 1494 8 5 1871 U10 L min Bar 31 3 62 36 1 82 40 4 103 USG PSI 8 3 899 9 5 1189 10 7 1494 SH160 U6 L min Bar 18 6 150 21...

Страница 9: ...st have flow and pressure limits that are either set within or can be adjusted to the limits of the thrusters capability We strongly advise that a shock valve is tted and set to 10 15 above the chosen...

Страница 10: ...thruster considering space required for installation operation and future maintenance 2 Mark the keel centre line on the inside of the hull Flip the SRF flange upside down and use the internal surfac...

Страница 11: ...ns fully without touching the hull If the hatch is obstructed by the hull lift the aft end of the SRF flange maintaining the reference height in front until the hatch clears the hull when opened 4 Pre...

Страница 12: ...flange and motor stable 3 Open and close the hatch multiple times to ensure Clearance from the hull and hatch while open Hatch closes flush with the hull and extra force is still transferred to the hu...

Страница 13: ...epoxy and breglass cutting or similar which laminating material is the actual boat builders responsibility Cover the upper part if grinding is necessary After moulding material have cured run the retr...

Страница 14: ...t glue is compatible with SRF and thruster case materials 2 Place the upper thruster Housing down on the SRF flange 3 Insert and fasten bolts Start with the 4 corner bolts followed by the remaining to...

Страница 15: ...excessive material before coating the hatch 9 Apply ller on to tunnel rings contact surface so the hatch will be secured properly Now re install hatch in its correct position Tighten bolts so hatch w...

Страница 16: ...peller It is required the propeller can rotate via hand power NB Rotating the propellers can be hard because of the gear reduction and the motor 4 Apply the gear leg and propeller with anti fouling de...

Страница 17: ...17 2933 6 2021 SH 240 SH 320 MG_0186 FWD DRAIN PORT A PORT B G Hydraulic connections EN MC_0174...

Страница 18: ...l tube has no loops and forms an airlock to stop the oil flow Ensure the oil tube angle is suf cient to allow oil to flow freely into the gear leg 3 Fill the oil tank with the same gear oil used in th...

Страница 19: ...th automatic main switch Setup with manual main switch Controller M 12V 5A red black yellow Terminator 120 ohm Terminator 120 ohm Retract panel Power supply cable Retract thruster Controller 6 1242 T...

Страница 20: ...e as short as practically possible POWER Cable Must be one in each system length 2 5m 4 Port T Connector The 4 port T connector allows multiple spur cables to be connected NB Comes with two sealing ca...

Страница 21: ...rusters Power supply cable red black yellow 12 24v S link supply End Terminator 120 ohm End Terminator 120 ohm Supply 12v 24v See dim table Position Sensor Crossover Valve Thruster Motor Actuator 1 Ac...

Страница 22: ...4v supply Crossover Valve Suggested supply cable dimensioning Max total length Sum of pos and neg cable 6 mm2 Fuse 25A 35A 35 50A 35 50A 24v 10m 16 8m 26 9m 42m 12v 4 2m 6 7m 10 5m 10 mm2 16 mm2 25 mm...

Страница 23: ...actuator s No 1 set to OFF when the retract has two actuators No 1 set to ON when the retract only has one actuator No 2 set to OFF when the retract does not have P8 type actuator s No 2 set to ON whe...

Страница 24: ...ur cut out is jagged or chipped use a sealant to assist the gasket 3 Place the gasket to the back face of the panel 4 Plug cables into the connectors at the rear of the control panel 5 Insert the cont...

Страница 25: ...ar house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightene...

Страница 26: ...n Manual have been complied with and that the defect remains e warranty service shall be performed only by the Warrantor or an authorized Service Centre and any attempt to remedy the defect by anyone...

Страница 27: ...27 2933 6 2021 SH 240 SH 320 MC_0037 Notes EN...

Страница 28: ...rect at the time it was published However Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain Continuous product improvement may change the product speci cation...

Отзывы: