
14
BILL OF MATERIALS FOR SC SERIES CONTROLLERS
Material List for SC-3
• SC-3 modular boiler control (part# 435-084)
• 1 Outdoor sensor (part # 339-070)
• 1 Universal sensor to be used as supply water sensor (part # 339-071)
• 1 Plastic tie strap
Material List for SC-9
• 1 SC-9 modular boiler control (part # 435-085)
• 1 Outdoor sensor (part # 339-070)
• 2 Universal sensors (part # 339-071)
- 1 to be used as supply water sensor
- 1 can be used as return water sensor
• 2 Plastic tie straps
Other Options include:
• Immersion well for supply water sensor: to be installed in control header supplied with Caravan
• High Limit (manual reset) and Immersion Well: to be installed in control header supplied with Caravan
• Low Water Cut-Off (manual reset): to be installed in modular boiler headers above modules cast iron heat exchanger
• Domestic Hot Water Control Packages: components include EMV valve; setpoint aquastat L6006A with immersion well. This is to
be used with external heat exchanger such as Caravan BP series brazed plate heat exchangers.
Circulators, switches, wiring and other relays are provided by contractor.
Содержание GAS Modular Boilers
Страница 2: ......
Страница 8: ...8 Figure 8 Typical layouts for gas fired systems...
Страница 15: ...15 FIELD WIRING AT MODULES...
Страница 16: ...16 SC 3 SYSTEM WIRING DIAGRAM...
Страница 17: ...17 SC 3 LADDER WIRING DIAGRAM...
Страница 18: ...18 SC 9 SPACE HEATING WIRING DIAGRAM...
Страница 19: ...19 SC 9 SPACE HEATING LADDER WIRING DIAGRAM...
Страница 20: ...20 SC 9 SPACE AND DOMESTIC HOT WATER WIRING DIAGRAM...
Страница 21: ...21 SC 9 SPACE AND DOMESTIC HOT WATER LADDER WIRING DIAGRAM...