Page 6
SkyVision Linx 300 Pre-Install • REV2
6" MIN.
CLEARANCE
W
ALL
W
ALL
WALL
26 5/16”
6-1/2"
20-1/2"
20" MIN.
CLEARANCE
90°
90°
(4) MOUNTING
HOLE LOCATIONS
A
B x B
C
D
D
E
E
F
F
G
G
J
H
H
B
K
L
I
Letter
Dimension
A
38-1/2"
B
12-1/2"
C
22-3/4"
D
1-3/8"
E
16"
F
5-3/8"
G
2-11/16"
H
13"
I
4"
J
33-1/4"
K
5-7/8"
L
4-3/8"
B
CONDUIT
BOXES
RACK
Figure 1. Rack Mounting and Junction Box Location (Left-Hand Swing Cabinet)
Содержание Linx 300
Страница 1: ...Pre Installation Manual SkyVision Linx 300 Integration Control System TEC R 0049 REV2 08 05 2015 ...
Страница 4: ...Page 2 SkyVision Linx 300 Pre Install REV2 ...
Страница 26: ...Page 24 SkyVision Linx 300 Pre Install REV2 NOTES ...
Страница 27: ...Page 25 SkyVision Linx 300 Pre Install REV2 NOTES ...
Страница 28: ...5085 Corporate Exchange Blvd S E Grand Rapids MI 49512 616 656 2900 FAX 616 656 2906 ...