SkyVision
Pre-Installation Evaluation
Facility
PO#
Date
The Pre-Installation Evaluation must be completed prior to the arrival of the SkyVision integration
system installation team. This form can be used to describe a multi-room installation if the
details that are room specific can be noted on the final page. In the event this evaluation is
not completed properly and additional visits are required, the customer will be billed at
$1900.00 per day, per technician.
Pre-Install Inspection
The inspec
ti
on must be performed by one Skytron SkyVision Technician, the local Skytron Account Representa
ti
ve,
the on-site customer contact and
perti
nent contractor representa
ti
ves.
Pre-install site evaluation
The evalu
ati
on consists of a review of the project docum
entati
on during a “walk through” of the en
tire
project site
and comp
leti
on of the checklist.
**
R
ETURN VISITS DUE TO INACCURATE
/
INCOMPLETE INSTALLATION VERIFICATION ARE SUBJECT TO BILLING
**
Environmental Considerations:
Do installed Conduit Runs match drawings in both sizing and lo
cati
ons?
Yes or no.
Are any conduit runs missing, changed or di
ff
erent from the submi
tt
al drawings?
Yes or no.
Are the Nurse Document Centers installed and placed in th
eir fi
nal lo
cati
on?
Yes or no.
Is there a 12” x 12” box for conduit termina
ti
on installed at the NDC or Rack loca
ti
on?
Yes or no.
Are the ceilings installed
Yes or no.
What is the ceiling material?
Will there be su
ffi
cient ceiling / mount access to pull cables through conduit?
Yes or no.
Is all drywall work
fi
nished?
Yes or no.
Are
the fin
ish
ed fl
oors installed?
Yes or no.
Has all work involving dust and paint has been completed?
Yes or no.
Is HVAC system completed?
Yes or no.
Power Considerations:
Will permanent power be live prior to Skytron installers arriving on site?
Yes or no.
Are two 120 VAC, 20A, properly circuit protected, dedicated circuits provided to power each
SkyVision system?
Yes or no.
Are properly sized NEMA4 enclosures and proper power circuit provided for all monitor power supplies
that are to be placed above the ceiling?
Yes, no or NA
Sample
For
Reference
Only
Содержание Linx 300
Страница 1: ...Pre Installation Manual SkyVision Linx 300 Integration Control System TEC R 0049 REV2 08 05 2015 ...
Страница 4: ...Page 2 SkyVision Linx 300 Pre Install REV2 ...
Страница 26: ...Page 24 SkyVision Linx 300 Pre Install REV2 NOTES ...
Страница 27: ...Page 25 SkyVision Linx 300 Pre Install REV2 NOTES ...
Страница 28: ...5085 Corporate Exchange Blvd S E Grand Rapids MI 49512 616 656 2900 FAX 616 656 2906 ...