20/11/2020
37/60
E_MH_Instalation_instructions_Skylux_Climax_Panorama
Finish
Finish
WALL PROFILE
GUTTER
Position seal C12 to increase the pressure of C1CX on the
glazing.
Position the MAS end panel on the freestanding sides of the
wall profile. Use the point indications on the MAS to deter-
mine the position of the second ZSG screw. Fasten the MAS
only after the roof has been completely installed.
MT
C12
C1CX
MAS
ZSG
Install the end panels and click the plastic plug in the cor-
responding holes . Apply a silicone sealant to the interior of
the end panel.
A frontal UGS water outlet is required to ensure the water
can flow outside when the water outlet is obstructed if the
gutter has a wall on both sides. Drill an opening with a Ø of
at least 33 and no more than 35 mm at the front of the gut-
ter. This opening should be lower than the overflow in the
gutter end panels.
ZSG (4x)
GDG
UGS
GDG
Содержание Climax Panorama
Страница 19: ...20 11 2020 19 60 E_MH_Instalation_instructions_Skylux_Climax_Panorama INSTALLATION TIPS CLIMAX PANORAMA ...
Страница 56: ...E_MH_Instalation_instructions_Skylux_Climax_Panorama 20 11 2020 56 60 ...
Страница 58: ...E_MH_Instalation_instructions_Skylux_Climax_Panorama 20 11 2020 58 60 ...
Страница 59: ...20 11 2020 59 60 E_MH_Instalation_instructions_Skylux_Climax_Panorama ...