20/11/2020
23/60
E_MH_Instalation_instructions_Skylux_Climax_Panorama
GDG gutter standard and in-between posts
ASSEMBLE THE GUTTER COMPONENTS TO PREPARE FOR THE INSTALLATION OF THE GUTTER.
= LED
≠ LED
Cut out the opening for the water outlet.
Use a Ø 80 mm circular drill for this task.
Slide in hinge profile S1 or S2.
Slide in LED profile GDGL. Length GDGL = distance between
posts.
(For information on LED lighting see page 54.)
* Reinforcement profile IPE 120 is not supplied. It can be bought at any local hardware shop.
We recommend treating the reinforcement profiles with an anti-corrosion product.
S1/S2
GDG
GDGL
Installation of U-bracket PU72 for GDG & IPE120
Slide in reinforcement profile IPE120* (optional) and install
the GDGK clips.
IPE120*
GDGK
‘click’
110
80
55
64
64
55
Ø 80
110
Slide the counter sheet in the gutter profile.
PT72
Position the U bracket PU72 and fix it with 3 bolts in the
counter sheet PT72.
55
4
4
PU72
BGDG
M10x30 (3x)
55
64
80
4
4
55
PU72
6,3 x 25 (4x)
Содержание Climax Panorama
Страница 19: ...20 11 2020 19 60 E_MH_Instalation_instructions_Skylux_Climax_Panorama INSTALLATION TIPS CLIMAX PANORAMA ...
Страница 56: ...E_MH_Instalation_instructions_Skylux_Climax_Panorama 20 11 2020 56 60 ...
Страница 58: ...E_MH_Instalation_instructions_Skylux_Climax_Panorama 20 11 2020 58 60 ...
Страница 59: ...20 11 2020 59 60 E_MH_Instalation_instructions_Skylux_Climax_Panorama ...