PN 38035_C
page 3 of 9
©2018 Skyline Exhibits TradeWinds® is a registered trademark of Skyline Exhibits
Tradewinds Immerse™ Display System Setup Instructions
Push plastic tabs on end of
channel bars into corresponding
slots at the corners of the frame.
Ensure graphic channel is around
perimeter of frame.
Index posts on frame with slots in
the middle of channel bars.
Frame Assembly
1. Expand frame by pulling
outward at each corner.
Black leveling knobs indicate
bottom of frame.
2. Lock frame in open position
by connecting adjacent pins
in center of frame, black
leveling knobs should be on
bottom of the frame.
1. Identify channel bar assemblies.
2. Connect segments to create a
solid, linier span.
3. Attach channel bars to frame:
Channel Bar Installation
A
B
Note: You may lay your frame on the
ground if necessary, to install
top channels.
Frame folded
Frame unfolded
Channel bars