Section 6 – Additional Procedures
Loading/Unloading
6.4-2 Lifting
1.
Place boom in stowed position centered
between drive wheels.
2.
On either the left or right side of the MEWP,
disconnect and lock out main power connector.
3.
Clear platform of all personnel, tools and
materials.
WARNING
When lifting the MEWP, lifting devices must be
attached to designated lift points only (refer to
Figure 26
).
WARNING
Use chains of ample load capacity sufficient to
withstand MEWP weight. Refer to the serial plate
of the MEWP for specific weight.
4.
Properly adjust rigging to ensure MEWP remains
level during lifting. See Center of gravity location
(
Figure 26
).
X
40.750 "
(1035.05mm)
X
30N
= 88.9mm (3.5")
C
L
40.750 "
(1035.05mm)
Figure 26
Lifting points/center of gravity
NOTE: Center of gravity varies with different options.