background image

19

SKOPE MISA Cool & Freezer Rooms

Installation

Installation Manual

Ceiling

Hangers

Rooms with large ceiling spans may require the use of ceiling hangers to 
support the ceiling. Ceiling hangers fit between ceiling panels and hang from 
either the building ceiling or from beam/s that span the cool room. 

301

        

 

 

 

 

 

 

 

     

 

Ceiling hanger kit

Ceiling hanger kit 

with MISA beam

Ceiling hanger kit installation 

(shown with MISA beam)

Room 
ceiling

Ceiling hanger

Room 
ceiling

Ceiling hanger

MISA beam

Ceiling hanger

MISA beam

Beam support

Ceiling 

panel

Содержание MISA FB 13G

Страница 1: ...MISA SKOPE MISA Cool Freezer Rooms Installation Manual MAN10745 Rev 6 0 Apr 2015 ...

Страница 2: ...ite www skope com INSTALLATION WARRANTY For installation and warranty enquiries please call SKOPE on 1800 121 535 MISA SKOPE MISA Cool Freezer Rooms Installation Manual MAN10745 Rev 6 0 Apr 2015 2013 SKOPE Industries Limited All rights reserved SKOPE Industries Limited reserve the right to alter specifications without notice is a registered trademark of SKOPE Industries Limited ...

Страница 3: ...6 3 Preparation Positioning the Room 9 Unpacking 10 Parts 11 4 Installation Tools and Materials Required 12 Fitting Parts Together 13 Room Installation 14 Freeblock Refrigeration Unit 20 Freeblock Control Panel 23 Electrics 25 Door Switch 27 Room Inspection 30 Drop In Refrigeration Unit 31 5 Servicing Cleaning 32 Door 32 ...

Страница 4: ...m Width Depth Height KLC1AF2M 3 07 FB 3G 1430 1430 2230 KLC2AF2M 4 06 FB 3G 1430 1830 2230 KLC3BF2M 6 71 FB 13G 1830 2230 2230 KLC3CF2M 8 37 FB 13G 2230 2230 2230 KLC4CF2M 10 05 FB 16G 2630 2230 2230 KLC4DF2M 11 99 FB 16G 2630 2630 2230 KLC5DF2M 13 95 FB 20G 3030 2630 2230 KLC5EF2M 16 25 FB 20G 3030 3030 2230 KLC6EF2M 18 56 FB 26G 3430 3030 2230 Model Temp range C Supply Volts 32 C Ambient 43 C Am...

Страница 5: ...mps Refer to the MISA Drop In specification sheet PSS0336 for detailed MISA Drop In specifications Model Temp range C Supply Volts Nominal capacity Watts Current draw Amps MB7SF 5 to 10 230 1450 2 7 MB13SF 230 2080 2 7 MB16SF 230 2450 2 9 MB20SF 230 3270 4 9 MB26SF 230 4400 2 5 MB4NSF 25 to 5 230 1190 2 7 MB9NSF 230 1690 2 7 MB15NSF 230 2480 4 1 ...

Страница 6: ...ch may require under floor heater wires or other additions The installer must ensure all electrical and refrigeration work is carried out by licensed technicians Ventilation The installer must ensure adequate heat extraction and ventilation is in place If not in place the installer must advise the customer of requirements and advise to have ready and in place for installation The installer not SKO...

Страница 7: ...prevail SKOPE s sole obligation should the products be found upon inspection by or on behalf of SKOPE not to meet the warranty is to at SKOPE s option repair or replace the products without charge provided that the liability of SKOPE shall in no event exceed the purchase price of the products The application of any warranty provided by SKOPE for MISA products is expressly excluded where a defect m...

Страница 8: ...ces For your own safety and that of others ensure that all electrical work is done by authorised personnel Ensure all necessary safety precautions are observed during installation or removal of the refrigeration unit Do not store explosive substances such as aerosol cans with a flammable propellant in this appliance Please contact SKOPE Customer Services for advice regarding disposal of this appli...

Страница 9: ...e between each end of the floor Level flooring prevents panel misalignment and ensures that the door shuts and correctly seals If the room is being installed without a MISA floor additional site preparation such as floor surface preparation should be completed prior to room installation Freezer rooms without a MISA floor should be installed onto insulated concrete External cold and freezer rooms a...

Страница 10: ...n cross piece as they are required to assist with removal of the refrigeration unit 2 Lift the door from the top of the pack Ensure the door is kept upright to avoid potential misalignment 3 Remove the box from the pack The box includes small parts 4 Remove the plastic film from the edge pieces 5 Lay the remaining parts out on the ground Start with the edge pieces then the wall panels and then the...

Страница 11: ...ang ceiling on top edge pieces on top of walls 7 Door panel Wall panel with door 8 Cam lock cover Plastic cap to cover cam lock holes White for walls and ceiling and silver for floor 9 Internal ramp kit Internal ramp used at base of door 10 Refrigeration unit Refrigeration unit 11 Compliance kit Light light switch external indicator and bell alarm Corner insert Not pictured Plastic cover for inter...

Страница 12: ...mm panels remove the sleeve from the pointed end of the tool The cam lock tool can also be used to assist with moving panels Insert the tool into the cam holes and use the tool as a handle to lift and manoeuvre panels see image below Silicone and Mastic Silicone should be used to ensure secure attachment and to keep moisture and grime from out of small gaps and spaces Mastic should be used in area...

Страница 13: ...second slot where practical Panel Cam Locks Cam locks are built into floor wall and ceiling panels They cannot be removed or replaced The cams move through three stages when locking open closed and locked A hook extends out from the cam when rotated fits into the slot on the aligned room piece and pulls in to seal the two pieces together Do not apply more than 1 5kg of pressure on the tool when lo...

Страница 14: ...low apply to rooms with a standard MISA floor If installing a floor less or set down room refer to the steps on the next page To install a standard MISA floor IMPORTANT Ensure the room is installed on a level surface 1 Lay the floor panels into position according to the plan The textured tread side of the panels should face up 2 Apply a bead of silicone above the top gasket rib on the side of the ...

Страница 15: ...gn the floor panel edge pieces around the floor panel perimeter see page 13 8 Lock floor panel edge pieces to the floor panels with cam locks page 13 9 Silicone and slot a 2 way corner cap into each corner of the floor The corner cap edges slide under the floor edge pieces for a tight fit IMPORTANT Freezer rooms without a MISA floor must be installed onto insulated concrete 1 Mark out the room on ...

Страница 16: ...crete plugs 6 Cut the front U Channel frame piece into two pieces to allow for the door opening To calculate the door opening size measure the overall size of the door frame and add 24mm 12mm each side for door trim For example if the door is 800mm wide the cut out opening size should be 824mm 7 Make a 30mm x 30mm square cut to each side of the front of the U Channel door side to allow the door bo...

Страница 17: ... wall panels correctly and lock in place with cam locks Note Rooms fitted with MISA Freeblock refrigeration unit will include a shorter panel The refrigeration unit is installed above this panel 5 Fit the top edge pieces on top of the back and side walls 6 Slot the ceiling support brackets into the edges of the ceiling panel s 7 Lift the ceiling panel s onto the room walls hang using the ceiling s...

Страница 18: ...de and work across Do not fit the door panel last 9 Fit the top edge piece s on top of the front wall 10 Slot a 2 way corner cap into each corner of the ceiling 11 Fit a corner insert into each corner inside the room 12 Fit the ramp inside the room at the bottom of the door frame Drill holes as necessary and fix in place with supplied fixing screws 13 If supplied fit the air curtain to the top of ...

Страница 19: ... the ceiling Ceiling hangers fit between ceiling panels and hang from either the building ceiling or from beam s that span the cool room 301 Ceiling hanger kit Ceiling hanger kit with MISA beam Ceiling hanger kit installation shown with MISA beam Room ceiling Ceiling hanger Room ceiling Ceiling hanger MISA beam Ceiling hanger MISA beam Beam support Ceiling panel ...

Страница 20: ...ty and Service Guidelines When installing using maintaining and servicing the Freeblock refrigeration unit follow the safety and service guidelines below Installation must be carried out in strict compliance with the diagrams and instructions supplied by the manufacturer Electrical connections must meet all relevant safety standards Use safety gloves to protect your hands from cuts The unit is not...

Страница 21: ... around the condenser must not exceed 43 C A poorly ventilated Freeblock refrigeration unit may overheat Mechanical extraction of condenser air into ceiling space or preferably out of the building is advised Power Supply We recommend that single phase Freeblock refrigeration units are hard wired to a 20 Amp circuit with isolation switch and that 3 phase Freeblock units are connected to a suitable ...

Страница 22: ... condenser The switch lights up green when switched on Note This switch is not the mains isolation switch A dedicated isolation switch must be included in the installation see Power Supply on page 21 4 Refit the front cover 5 Connect up the electrical components see page 25 complete the room inspection see page 27 and installation checklist see back page Main switch ...

Страница 23: ...on changing the set point and documentation supplied with the refrigeration unit for further information Eliwell Control Panel Refer to the diagram and table below for button identification eco aux set aux on off 1 2 3 4 5 6 Item Icon Function 1 Up button Used for programming 2 Aux button Used for programming Note This button must not be used as a light switch 3 On Off button Press to put the refr...

Страница 24: ...2 Set button Used for programming 3 On Off button Press to put the refrigeration into and out of standby Note When in standby the interior light still functions as normal 4 Up Defrost button Used for programming Press and hold for five seconds to initiate a manual defrost 5 Down button Used for programming 6 Light button Not applicable Note This button must not be used as a light switch ESC SET 1 ...

Страница 25: ... room The external indicator illuminates when the light is on The light should be mounted inside the room typically on the ceiling the light switch should be mounted inside the room next to the door and the external indicator should be mounted beside the door on the outside of the room The alarm bell must be fitted to the door follow instructions included with the bell Combo rooms must have the MI...

Страница 26: ...are connected to a suitable circuit as required as specified on the unit rating label The door switch cable is wired up to a door switch located above the door see Door Switch on page 27 Door Heater Wiring The door heater wires are located in the door panel around the door opening and can be accessed by prying off the edge of the door opening beside the door heater electrical box The door heater m...

Страница 27: ...h cable to connect the door switch If a door switch is not being used the door switch cable should be removed Follow the swing door procedure below or sliding door procedure page 29 to fit the door switch Swing Door Follow the procedure below to install the swing door switch Parts required To install the swing door switch and activator bracket 1 Unscrew the door switch arm and rotate 90 anti clock...

Страница 28: ...t Fix in place with the two 3 8 45 fixing screws supplied 6 Open and close the door and ensure the door switch activator activates the door switch lever 7 Remove the door switch cover by loosening the anchoring screw and use a 2 1 5mm cable to connect the door switch to the refrigeration unit electronic controller Note Free block refrigeration units are are supplied with a door switch cable just c...

Страница 29: ...lace with three 3 2 8 rivets supplied 3 Drill two 2 5mm holes through the existing holes in the door switch bracket and fit the door switch to the door switch bracket Fix in place with two 3 8 45 fixing screws supplied 4 Remove the door switch cover by loosening the anchoring screw and use a 2 1 5mm cable to connect the door switch to the refrigeration unit electronic controller Note Free block re...

Страница 30: ...hutting yourself inside the room If no light filters through the room is assembled correctly If light does filter through realign the panels to seal any gaps and check that the door is correctly fitted see page 32 for door servicing After checking that the room is assembled correctly fit the plastic caps over the cam lock holes The white caps are for the walls and the silver caps are for the floor...

Страница 31: ... and airflow around the Drop In refrigeration unit Poor ventilation will void the warranty The unit condensing temperature must not exceed 45 C If adequate airflow is not available mechanical air extraction must be used Mechanical extraction of condenser air into ceiling space or preferably out of the building is advised Enclosures If the Drop In refrigeration unit is enclosed the enclosure must h...

Страница 32: ...lways isolate the refrigeration unit from the power supply when cleaning the condenser coil Door Door Seal To ensure the room operates correctly and efficiently the door must close and seal correctly To check this enter the room and shut the door No light should filter around the door opening If light is filtering through check the door and gasket for alignment and adjust as necessary see Door Ali...

Страница 33: ...ow the steps below to access the door heater wire To access the door heater wire 1 Open the door and use a small screwdriver to unclip and remove the door handle cover from the inside of the door 2 Loosen the two adjustment screws 3 Move the lock section of the handle in or out as necessary to align correctly 4 Once the door is correctly aligned tighten the two adjustment screws and refit the door...

Страница 34: ......

Страница 35: ... airflow around the refrigeration unit If adequate airflow is not available a suitable heat extractor has been installed The room has been installed on a flat and level concrete surface as per the installation manual Room inspection has been performed The supplied roof supports have been used to support the room roof Operation Tick to indicate everything is operating correctly Airflow is unimpeded...

Страница 36: ......

Отзывы: