6
Commissioning
Installation Manual
SKOPE MISA Cool & Freezer Rooms
2
Commissioning
Installation Guidelines
Registration
MISA cool rooms, freezer rooms and drop-in refrigeration units must only be
installed by an approved SKOPE registered installer.
To register, the installer must complete the SKOPE online registration form,
available on the SKOPE website - www.skope.com.
SKOPE will confirm if the installer is approved as a SKOPE registered
installer for MISA products.
Compliance
The installer must follow the installation guidelines as set out in this MISA
installation manual for the construction of MISA Cool and Freezer rooms.
All cool room panels and equipment supplied by SKOPE must be installed
in accordance with all relevant laws, regulations, building codes and
standards ("Building Codes"). SKOPE may provide information regarding
aspects of the Building Codes but this is provided as general information
only and does not detract from the installer's responsibility to ensure that all
equipment is installed in accordance with the Building Codes
The installer must check if the installation is within the tropical zone, which
includes everywhere north of Byron Bay, Queensland. If the installation is
within the tropical zone, the installer must consider the tropical environment
which may require under floor heater wires or other additions.
The installer must ensure all electrical and refrigeration work is carried out
by licensed technicians.
Ventilation
The installer must ensure adequate heat extraction and ventilation is in
place. If not in place the installer must advise the customer of requirements
and advise to have ready and in place for installation.
The installer, not SKOPE, is responsible for ventilation of the refrigeration
equipment.
Installation
Installation must be completed in accordance with the MISA installation
manual provided by SKOPE.
The installer must obtain an accurate MISA room plan from the customer
prior to beginning an installation.
The installer must carry out a site inspection prior to confirmation of room
order to ensure adequate ventilation of the refrigeration unit, and correct
dimensions and placement of the room and refrigeration system.
Checklist
After the room has been installed the installer must complete the MISA
installation checklist found on the back page of this manual. A completed
copy of the checklist must stay on site and a copy sent to SKOPE.
Warranty
Subject to the conditions and exclusions set out in the SKOPE Warranty
Terms (http://www.skope.com/support/warranty) and provided that the
installation is completed by an approved SKOPE registered installer and in
accordance with the installation guidelines set out in this MISA installation
manual, SKOPE warrants that, for the period of two years commencing on