Страница 1: ...The DL850 270 D SAM 4682 3 RevB Doppler Log Getting started NO WWW...
Страница 2: ...nr ZZK 01011 Mounting the bridge unit 1 The bridge unit is mounted in or near the bridge allowing a space for the air to escape at the back of the cabinet 10mm The bridge unit will accept 24VDC or 115...
Страница 3: ...ight Mounting the Transceiver LED A Power 1 Mount the unit on a solid wall The unit weighs 17 kg Ground the unit via the bolts or with a cable to the ships ground Route power to the unit mains 24DC or...
Страница 4: ...Installing the Combo Tank and DL270 sensor in Tank See separate manual for full details ComboTankInstManual...
Страница 5: ...he transceiver screw terminals J503 and J502 are also colour coded Attach the cables as per diagram p 62 operator and installation manual The cable from the transceiver box to the deck unit is connect...
Страница 6: ......
Страница 7: ...docking units have 2 comports and will accept both ROT required and GPS optional Operational Check CARE The system should ideally not be powered in air if however you wish to check the system the tran...