7. First start-up
6
- 41 -
951-180-087-EN
Version 01
7. First start-up
P
ulse generators of the product series SP/
SFE 3003 and SP/SFE3006 are delivered in
an operational state and can be used imme-
diately following proper installation. Ensure
that the pulse generators and their connec-
tions are properly sealed.
To ensure safety and functionality, the per-
son specified by the operator is required
to perform the following inspections. Any
detected deficiencies must be resolved im-
mediately. The correction of deficiencies
must be done exclusively by a specialist
competent and authorized to do so.
7.1 Inspections before irst start-up
YES
NO
Electrical connection established correctly
Mechanical connection established correctly
The performance characteristics for the aforementioned connections match the speci-
fications in “Technical data.”
All components such as lubrication lines and metering device are correctly mounted.
No apparent damage, contamination, or corrosion
Any dismantled protective and monitoring equipment is fully reinstalled and functional
Equipotential bonding fully present, properly connected, and electrically continuous
No accumulated dust present
7.2 Inspections during initial commissioning
No unusual noises, vibrations, moisture accumulation, odors present
No undesired discharge of lubricant at connections (leakage)