background image

チコーエアーテック株式会社

Copyright CHIKO AIRTEC CO., LTD. 2009

12

5.3

各線の色と信号について

Color and signal of each wire

入力

INPUT

:①

接点入力

Contact input

インピーダンス

Impedance

1.0

Ω   

出力

OUTPUT

:②~⑥オープンコレクタ

Open collector

耐圧

Voltage resistance 50

V (≦

100

㎜A)

failure.

線色

Wire color

PIN

NO.

信号名称

Signal name

役割

Role

Black

運転入力信号

Operation input signal

(

)

R

e

m

o

te

si

g

n

al

s

①と④と⑧を短絡して運転を開始させます

Short-circuits the wires [1], [4] and [8] to start operation.

/

Red/white

遠隔操作切替信号

Remote-control operation
switching signal

④と⑧を短絡してリモート操作に移行させます
短絡するとタッチパネルの操作はできなくなります

Short-circuits the wires [4] and [8] to start remote operation.
The AT panel is disabled while the wires [4] and [8] are
short-circuited.

/

Yellow /white

Gnd

/

Black/White

運転圧力信号

Operation pressure signal

O

u

tp

u

t

si

g

na

ls

現在の運転圧力を取り出します

Transfers the current operation output.

アナログ信号

Analog signal

0

5V

インピーダンス

Impedance

(≧

4.7

kΩ)

Red

フィルタ目詰出力信号

Filter clogging output signal

目詰まり信号を取り出します

Transfers the clogging signal.

オープンコレクタ出力

Open collector output

Green

運転出力信号

Operation output signal

運転信号(ONランプ)を取り出します

Transfers the operation signal (ON indicator lamp).

オープンコレクタ出力

Open collector output

/

Green/White

過負荷信号

Overload signal

過負荷信号を取り出します

Transfers the ” overload “ signal

オープンコレクタ出力

Open collector output

Yellow

サービス電源

Service power supply

サービス電源を取り出すことができます
他のケーブルとは短絡しないで下さい。

Transfers the service power supply.
Do not short circuit this wire with other wires.

DC

12

負荷インピーダンス

Impedance

(≧

1

kΩ)

Содержание SKV-250AT-ACC

Страница 1: ...is instruction manual thoroughly and handle this SK Series machine correctly so that you can use it safely for a long time and enjoy its full performance Symbols used in this manual WARNING This symbo...

Страница 2: ...osene paint etc Explosive dust Aluminum magnesium titanium zinc epoxy etc Dust containing sparks Dust containing sparks generated by high speed cutters grinders welding machines etc Fire sources Cigar...

Страница 3: ...T AT panel 7 4 3 Remote connector 9 4 4 Confirmation before operation 9 4 5 Operation procedure 10 5 Remote Cable Sold Separately 11 5 1 Electrical circuit diagram 11 5 2 Remote Cable 11 5 3 Color and...

Страница 4: ...y Do not install it outdoors 0 40 80 Install the product in a place without dew condensation at room temperature ambient temperature 0 to 40 C humidity 80 or less High temperature and dew condensation...

Страница 5: ...repair 1 6 Disposal Dispose of the product properly as industrial waste 2 Confirmation and Preparation at Arrival After unpacking make sure that all parts are provided Contact our company immediately...

Страница 6: ...e 1 Active carbon Colliding with granulated active carbon collects the particles passed through the primary filter and odor is removed carbon particle into the blower Main filter Collecting Adsorbing...

Страница 7: ...When the filter replacement indicator lamp red turns ON replace the primary filter filter bag If the filter replacement indicator lamp does not turn OFF even after replacement of the primary filter f...

Страница 8: ...eases by 1 level Minimum suction level Approximately 60 Hi 1 1 100 Hi switch Every time this switch is pressed the performance increases by 1 level Maximum suction level 100 ON switch and OFF switch t...

Страница 9: ...ng plug are connected correctly insulation is provided properly and the rated voltage is realized Confirm items 1 to 3 above and then proceed to the item 4 AT Turn ON the MAIN POWER switch and confirm...

Страница 10: ...nd confirm that the power indicator lamp lights Starts the dust collector AT ON Press the ON switch to start the operation 7 Choose operation ability in seven levels Push Lo switch or Hi switch in AT...

Страница 11: ...panel and cause The wire 7 yellow is put inside a shrinkable tube so that it cannot be short circuited with other wires Remote operation switch ON Shifting to remote mode Remote control is possible in...

Страница 12: ...ion The AT panel is disabled while the wires 4 and 8 are short circuited Yellow white Black White Operation pressure signal Output signals Transfers the current operation output Analog signal 0 5V Imp...

Страница 13: ...Copyright CHIKO AIRTEC CO LTD 2009 13...

Страница 14: ...in body Transfer required output signals in accordance with the explanation in 5 3 Color and signal of each wire AT ON Lo Hi Change with Lo Hi switch pushing the ON switch of main body AT panel when y...

Страница 15: ...fore starting inspection Using a worn or damaged filter will release sucked dust to the atmosphere and damage electrical parts Make sure to inspect and maintain to prevent failures and accidents in th...

Страница 16: ...make sure to attach it vertically If the nipple is inserted diagonally the clogging indicator lamp may malfunction and turn ON 1 Release the snap locks of the filter case and remove the primary filter...

Страница 17: ...ds generated Is the installation level correct Filter installation status Once month Are the filters installed securely Filter clogged status Suction force check During operation Does the suction hose...

Страница 18: ...verheated by clogged filters 3 30 After checking 1 to 3 above remove the cause of error and press the RESET switch Or turn OFF and ON the MAIN POWER switch to reset the error status Start the operatio...

Страница 19: ...Copyright CHIKO AIRTEC CO LTD 2009 19 8 Indication of DANGER Labels SKV 250AT ACC SKV 450AT ACC V1...

Страница 20: ...Copyright CHIKO AIRTEC CO LTD 2009 20 9 Electrical Circuit Diagram SKV 250AT ACC SKV 450AT ACC V1...

Страница 21: ...7 2 35 58 70 62 5 1 dB Note The Noise column indicates a value dB on the scale A at 1 m on the main body side when the hose is connected to the suction port 11 Consumable Parts List Model 1 Primary f...

Страница 22: ...ubject to change without prior notice Memo about purchase Model Manufacturer s serial number Date of purchase Start of operation Your name Address Phone Person in charge LTD 562 0012 1 1 33 1 1 33 Hak...

Отзывы:

Похожие инструкции для SKV-250AT-ACC