10
ASSEMBLY
Assembly is highly dangerous and must be carried out in strict accordance
with the following instructions. We recommend that assembly be performed
by qualified personnel. We also recommend that assembly be carried out in a
flat, open area with no people (particularly children) nearby who could be
severely injured if they were to touch or move any parts of the machine.
Assembly sequence:
Attach the arms (2) to the housing (1), placing them over the pins (3). Fasten
the arms by inserting spring pins (4) into holes (A), and then insert the inside
spring pins (5).
Attach the axle (2) to the housing (1). Insert pin (3) into hole and fasten with the spring pin.
Attach the cylinder (4) with the pin (5) and (6), fasten pin with the spring pin.
Содержание SR 320/8 H
Страница 1: ...USE AND MAINTENANCE SPARE PARTS LIST SR 320 8 H ROTARY RAKES HYDRAULIC LIFT Pull type 2011 ...
Страница 11: ...11 Attach the cylinder adjustment assembly 2 to the drawbar 1 fastening with the spring pin ...
Страница 13: ...13 Mount the grease nipple 1 on all bush ...
Страница 17: ...17 Attach the universal joint casing 2 using screws 3 nuts 4 ...
Страница 29: ...29 CHAPTER 8 SPARE PARTS LIST ...
Страница 30: ...30 ...
Страница 32: ...32 ...
Страница 34: ...34 ...
Страница 36: ...36 ...
Страница 38: ...38 ...
Страница 41: ...41 ...