EM330D User Manual
A Special Purpose Inverter for Hoisting
80
F4-28=9
Defaults of corresponding parameters will be building hoist application macros.
See 6.3.4 for details.
★
F4-28 is disabled for EM330D. Customer can define the parameters of F4-28 as per
6.3.4
Application macros cannot meet all application needs.Therefore, the parameters have
to be slightly adjusted after the application macros selected.
7.6
Group C0: Parameters of Monitoring Function
When EM330D is running, operation parameters can be acquired by checking monitor
parameters in Group C0. Details of all monitor parameters are read only.
When inverter is running, F4-20 defines the default of displayed monitor parameter.
No.
Function
Range and Description
Unit
C0-00
Output Frequency
Present output frequency of inverter
Hz
C0-01
C0-02
Input Frequency
Present setting frequency of inverter
Hz
C0-03
C0-04
Synchronous Frequency
Estimated motor sync-frequency of inverter
Hz
C0-05
C0-06~C0-07
Not Used
C0-08
Estimated Feedback Frequency
Present output frequency calculated by inverter
based on the output voltage and output current.
Hz
C0-09
C0-10
Estimated Slip Frequency
Inverter calculates present slip frequency based on
the output voltage and output current.
Hz
C0-11
C0-12
Output Current Percentage
The percentage of inverter’s present output current
and rated output current
%
C0-13
Effective Output Current Value Effective value of inverter’s present output current
A
C0-14
Output Voltage Percentage
Percentage of inverter’s present output voltage and
rated output voltage
%
C0-15
Effective Output Voltage Value Effective value of inverter’s present output voltage
V
C0-16
DC Bus Voltage
Present DC bus voltage of inverter
V
C0-17~ C0-18
Not Used
C0-19
Program Operation Section
Monitor the present program operation section of
inverter.
SECT
C0-20
Running Time of Present
Section of Program Operation
In program operation, the unit of running time at
present operation section is up to the ten
thousand’s place of F6-00.
S/min
C0-21
Output Power
Output power calculated by inverter
kW
C0-22~C0-25
Not Used
C0-26
Input Terminal Status
X7
X6
X5
X4
X3
X2
X1
0
0
0
0
0
0
0
X1 is the LSB.(Monitor the logic status of external
input terminals)
C0-27
Output Terminal Status
*
*
*
*
R1
Y2
Y1
0
0
0
0
0
0
0
Y1 is the LSB. (Monitor the logic status of output
terminals)