CONTENTS
02
05
05
1
1.1
01
01
use conditions of the unit
ACCESSORIES
INTRODUCTION
2 SAFETY CONSIDERATION
07
06
08
09
6
08
Outline dimensional drawing
Requirements of arrangement space of the unit
Space requirements for parallel installation of multiple Modular units
Installation foundation
Installation of damping devices
6.1
6.2
6.3
6.4
6.5
PRECAUTIONS ON INSTALLATION
10
7 TYPICAL APPLICATION EXAMPLES
11
10
8
12
14
17
24
Main parts of the uint
Opening the uint
System diagram
Outdoor unit PCBs
Electric wiring
Water system installation
8.1
8.2
8.3
8.4
8.5
8.6
OVERVIEW OF THE UNIT
28
9 STRAT-UP AND CONFIGRUATION
29
29
10
Check item table after installation
Trial run
10.1
10.2
TEST RUN AND FINAL CHECK
4 IMPORTANT INFORMATION ON REFRIGERANT
5 SELECTION OF INSTALLATION SITE
04
3
Handling of the unit
3.1
BEFORE INSTALLATION
Содержание SCV EB Series
Страница 1: ...AIR COOLED CHILLER UNIT INSTALLATION AND USER MANUAL SCV XXX B AIR CONDITIONING...
Страница 2: ...Original instructions...
Страница 3: ......
Страница 49: ......
Страница 50: ...NOTE 44...
Страница 51: ......
Страница 52: ...0 1 234 56 0 7 8 234 0 9 1 7 1 0 6 16 3 5 9 4 260 88 4 260 88 08 88 688 0 4 08 4 6 4A8 60 B...