background image

8 June 2018 • Simplex Service 800

-637-

8603 • Page 

1 of 19 

Swift-E / Swift-E+ Load Bank Manual 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SWIFT-E/SWIFT-E+ 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Portable Load Bank

 

Содержание SWIFT-E

Страница 1: ...8 June 2018 Simplex Service 800 637 8603 Page 1 of 19 Swift E Swift E Load Bank Manual SWIFT E SWIFT E Portable Load Bank...

Страница 2: ...00 637 8603 Page 2 of 19 Swift E Swift E Load Bank Manual This manual was last revised 8 June 2018 For up to date information on this product or others please contact Simplex at 800 637 8603 or on the...

Страница 3: ...ion 10 IV A Load Bank Placement 10 IV B Wiring the load bank 10 IV C Meter Setup Information 10 IV D Current Transformer Ratio 11 IV E Meter Display 11 V Operating Instructions 12 V A Startup 12 V B A...

Страница 4: ...perator must be familiar with its contents and have access to it during operation High Voltage Turn off and disconnect power source before opening this equipment High Temperature Allow hardware to coo...

Страница 5: ...ent If work must be done around an operating unit stand on an insulated dry surface to reduce the risk of electrocution Do not handle any kind of electrical device while standing in water while barefo...

Страница 6: ...extinguisher Its fumes are toxic and the liquid can deteriorate wiring insulation Keep the extinguisher properly charged and be familiar with its use If there are any questions pertaining to fire exti...

Страница 7: ...loy To reduce the risk of electrical shock and short circuiting of elements the element has a non conductive exterior The element is also rust proof vibration proof and shock proof Swift E load banks...

Страница 8: ...43 8 45 8 47 9 50 240V 19 8 20 8 21 9 22 9 24 25 Watts 6250 6500 6750 7000 7250 7500 120V 52 1 54 2 56 3 58 3 60 4 62 5 240V 26 27 1 28 1 29 2 30 2 31 3 Watts 7750 8000 8250 8500 8750 9000 120V 64 6 6...

Страница 9: ...spection is recommended before installation and as part of the 50 hour 6 month maintenance schedule or as a load bank is relocated 1 If the crate shows any signs of damage examine the load bank in the...

Страница 10: ...e Figure 1 Airflow diagram and ensure the area around the load bank is clear of debris The load bank elements are cooled by dual 135mm fans and the unit operator must make allowances for the hot load...

Страница 11: ...ottom display on the meter There are four options Loop which will cycle through three following measurements 1 FrQ which will show the power frequency 2 ACt which will display the load generated measu...

Страница 12: ...ep is activated 2 Activate each load step by switching the desired step on This step if done while the Master switch is activated will apply the load instantly For example while the Master switch is a...

Страница 13: ...Once the cause has been determined and fixed the load bank is ready to be reconnected and the operation can resume VI B Tripped Circuit Breaker The main breaker will trip and the unit will shut off if...

Страница 14: ...nnector Red Accepts 2 0 3 0 and 4 0 cables Up to 600 volts 405 amps Product number 25608721 Male 16 series Cam Lok connector White Accepts 2 0 3 0 and 4 0 cables Up to 600 volts 405 amps Product numbe...

Страница 15: ...E Swift E Load Bank Manual Simplex also offers vinyl and hardshell cases Please contact your sales representative or call the Simplex Inc sales department at 800 637 8603 ext 3 Hardshell shipping case...

Страница 16: ...more information about resetting the circuit breaker Check control fuses on front of load bank to ensure they aren t blown See page 17 to see where the fuses are located Remove faceplate and check lo...

Страница 17: ...8 June 2018 Simplex Service 800 637 8603 Page 17 of 19 Swift E Swift E Load Bank Manual Figure 5 Top of Load Bank 14 20 Figure 6 Front of Load Bank Figure 7 Subpanel 4...

Страница 18: ...le Switch 9 14031000 Control Fuses 5A 250V 10 14011000 Control Fuses 2A 250V 11 54885650 Relay Bale 12 24885000 Relay Base Socket 13 24785300 Relay 14 50020220 Relay Base Bracket 15 25130000 Resistor...

Страница 19: ...properly maintained f parts supplied by buyer for inclusion in finished equipment are not covered by this warranty g components or assemblies specified by buyer with no substitution permissible that...

Страница 20: ...and Fuel Supply needs Simplex Inc Simplex Inc 5300 Rising Moon Road 2100 Boggs Road Springfield IL 62711 Duluth GA30096 800 637 8603 www simplexdirect com This manual and all of its contents Copyrigh...

Отзывы: