Sime RS 10 Скачать руководство пользователя страница 2

CONTENTS

1

DESCRIPTION OF THE BOILER

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

49

2

INSTALLATION

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

50

3

CHARACTERISTICS

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

55

4

USE AND MAINTENANCE

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

57

INSTALLER INSTRUCTIONS

IMPORTANT

When carrying out commissioning of the boiler, you are highly recommended to perform the following checks:

–Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.

–Make sure that the electrical connections have been made correctly and that the earth wire is connected to a

good earthing system.

–Open the gas tap and check the soundness of the connections, including that of the burner.

–Make sure that the boiler is set for operation for the type of gas supplied.

–Check that the flue pipe for the outlet of the products of the combustion is unobstructed.

–Make sure that any shutoff valves are open.

–Make sure that the system is charged with water and is thoroughly vented.

–Activate the circulation pump if this is not governed by an automatic system.

–Purge the system, bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas

valve inlet.

–Make sure that none of the regulation, control and safety devices and appurtenance have been tampared with.

NOTE: Upon commissioning of boiler or after a long period of lay-off, you are recommended to bleed off any

air that may be present in the gas pipes; otherwise, delays may occur in burner ignition, and the appliance

may “lock out”. To deblock the system, wait at least 20 seconds from when the warning lamp lights up. 

In the event of electric power not reaching the equipment, the burner will go out immediately. 

As soon as normal conditions are restored, the boiler will start up again automatically. 

When gas pressure is insufficient, the burner will go out immediately and the system lock-out signal will light

up, as well as the gas pressure red warning light. In this case, for reasons of safety, the boiler cannot be star-

ted up by pressing the deblocking button. Boiler re-ignition will take place automatically as soon as the mini-

mum pressure value set on the gas pressure switch (10 mbar) is restored.

EN

GLISH

Содержание RS 10

Страница 1: ...RS IT ES GB PT...

Страница 2: ...rge the system bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas valve inlet Make sure that none of the regulation control and safety devices and appurtena...

Страница 3: ...II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 Type B11 B11 B11 B11 B11 B11 B11 B11 B11 Maximum temperature C 95 95 95 95 95 95 95 95 95 Mains gas nozzles Quantity n 5 6 7 8 9 10 11 12 13 Meth...

Страница 4: ...limiting pressure loss between the gas meter and any apparatus being used to not greater than 1 0 mbar for family II gases natu ral gas 2 0 mbar for family III gases butane or propane An adhesive data...

Страница 5: ...must be at least 500 mm Access to the chamber must be guaranteed by means of an opening provided with an air tight metal door have a circular square or rectangu lar internal cross section in the case...

Страница 6: ...pieces which are to be joined together using the screws provided fig 5 The smoke chamber is assembled by fastening the right hand side panel 2 to the top panel 1 using the nine hexagonal head self tap...

Страница 7: ...l 6 and the panels 7 and 8 to the panel 9 by means of the pressure pins making sure that they are joined together using the two self tapping flathead screws 7SP x 1 2 provided assemble the panels 4 an...

Страница 8: ...provided between the head and the intermediate section at the other end of the body NOTE Take the utmost care when assembling the two electrodes so as not to break the ceramic coating which otherwise...

Страница 9: ...rough the SM 191 1 programmer and the gas valve opens at the same time Burner ignition normally takes place within 1 or 2 seconds However it is possible for ignition failures to occur with consequent...

Страница 10: ...regu lating thermostat with a double con tact having differentiated setting This makes it possible to obtain a reduction of heat output before the burner goes out completely by means of the coil asse...

Страница 11: ...4085 is supplied by a rectified con nector code 6243600 which in the event of breakage must be replaced To replace it follow the instructions of fig 18 4 USE AND MAINTENANCE KEY 1 Electric operator 2...

Страница 12: ...e minimum posi tion until you hear the click of the first contact of the thermostat leave the knob in that position and turning the screw 4 seek the reduced pressure value according to Table 3 for the...

Страница 13: ...upon first ignition or after long periods of lay off Check whether the rectifier card on the connector that supplies the gas solenoid valve is working properly If necessary replace Valve coil has a b...

Страница 14: ...scharge cur rent to the ignition electrode and simul taneously opening the gas valve Ignition of the burner normally takes place within 1 or 2 seconds For various reasons the boiler may fail to start...

Страница 15: ...y to convert to a different gas from that for which the boiler has been arranged get in touch exclusively by authorized technical staff CLEANING AND MAINTENANCE At the end of each heating season it is...

Отзывы: