This occurs when the position of live
and neutral has not been respected
on  the  terminal  block.  There  is  a
break  in  the  wire  of  the  sensing
electrode  or  the  electrode  itself  is
earthed:  the  electrode  is  worn  out
and needs replacing.

NOTE: 
Should  the  equipment  “lock  out”,
first  wait  at  least  20  seconds  from
when  the  warning  lamp  lights  up,
before  pressing  the  push-button
with  built-in  light;  otherwise,  the
appliance will not be deblocked.

3.1.2

Ionization circuit

The  ionization  circuit  is  to  be  checked
using  a  dial-type  micro-ammeter,  or
preferably  a  digital  micro-ammeter
with a 0 to 50 µA scale. 
The micro-ammeter terminals must be
series-connected  to  the  wire  of  the
sensing electrode. 
Under  normal  operating  conditions,
the value oscillates between 6÷12 µA. 
The  minimum  value  of  the  ionization
current  for  which  the  equipment  can
“lock out” is about 1 µA. 
In this case, make sure that there is a
good  electrical  contact  and  check  the
degree of wear of the end part of the
electrode and the corresponding cera-
mic protection.

3.2

REGULATION THERMOSTAT

“RS” 

boilers are equipped with a regu-

lating  thermostat  with  a  double  con-
tact  having  differentiated  setting.  This
makes it possible to obtain a reduction

of heat output before the burner goes
out  completely,  by  means  of  the  coil
assembly (fig. 20) installed on the gas
valve regulator. 
This  step-modulation  system  affords
the following advantages:
–higher overall boiler efficiency;
–cont ainment  wit hin  accep t able

values of the increase in temperatu-
re  that  takes  place  in  the  cast-iron
body  (heat  inertia)  when  the  burner
goes out.

3.3

LAYOUT WITH TWO 
OPPOSED BOILERS

Accessories  are  available  on  request
to permit an opposed layout of two boi-
lers  which  will  reduce  overall  dimen-
sions and facilitate connection with the
flue through a single flue gas duct (figu-
res 14 - 15).
Table  2 gives  the  dimensions  of  the
two boilers combined and the diameter
of the chimney. 

Fig. 14

TABLE 2

D (ø mm)

L (mm)

A (mm)

RS  6

400

2360

600

RS  7

400

2360

600

RS  8

400

2360

600

RS  9

400

2360

600

RS 10

450

2360

600

RS 11

450

2360

600

RS 12

500

2380

620

RS 13

500

2380

620

RS 14

500

2380

620

Connecting cover

Connecting panel

RS 6

6136208

6136251

RS  7

6136209

6136251

RS  8

6136210

6136251

RS  9

6136211

6136251

RS 10

6136212

6136252

RS 11

6136213

6136252

RS 12

6136205

RS 13

6136206

RS 14

6136207

Fig. 15

KEY
1 Connecting cover
2 Connecting panel

Содержание RS 10

Страница 1: ...RS IT ES GB PT...

Страница 2: ...rge the system bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas valve inlet Make sure that none of the regulation control and safety devices and appurtena...

Страница 3: ...II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 Type B11 B11 B11 B11 B11 B11 B11 B11 B11 Maximum temperature C 95 95 95 95 95 95 95 95 95 Mains gas nozzles Quantity n 5 6 7 8 9 10 11 12 13 Meth...

Страница 4: ...limiting pressure loss between the gas meter and any apparatus being used to not greater than 1 0 mbar for family II gases natu ral gas 2 0 mbar for family III gases butane or propane An adhesive data...

Страница 5: ...must be at least 500 mm Access to the chamber must be guaranteed by means of an opening provided with an air tight metal door have a circular square or rectangu lar internal cross section in the case...

Страница 6: ...pieces which are to be joined together using the screws provided fig 5 The smoke chamber is assembled by fastening the right hand side panel 2 to the top panel 1 using the nine hexagonal head self tap...

Страница 7: ...l 6 and the panels 7 and 8 to the panel 9 by means of the pressure pins making sure that they are joined together using the two self tapping flathead screws 7SP x 1 2 provided assemble the panels 4 an...

Страница 8: ...provided between the head and the intermediate section at the other end of the body NOTE Take the utmost care when assembling the two electrodes so as not to break the ceramic coating which otherwise...

Страница 9: ...rough the SM 191 1 programmer and the gas valve opens at the same time Burner ignition normally takes place within 1 or 2 seconds However it is possible for ignition failures to occur with consequent...

Страница 10: ...regu lating thermostat with a double con tact having differentiated setting This makes it possible to obtain a reduction of heat output before the burner goes out completely by means of the coil asse...

Страница 11: ...4085 is supplied by a rectified con nector code 6243600 which in the event of breakage must be replaced To replace it follow the instructions of fig 18 4 USE AND MAINTENANCE KEY 1 Electric operator 2...

Страница 12: ...e minimum posi tion until you hear the click of the first contact of the thermostat leave the knob in that position and turning the screw 4 seek the reduced pressure value according to Table 3 for the...

Страница 13: ...upon first ignition or after long periods of lay off Check whether the rectifier card on the connector that supplies the gas solenoid valve is working properly If necessary replace Valve coil has a b...

Страница 14: ...scharge cur rent to the ignition electrode and simul taneously opening the gas valve Ignition of the burner normally takes place within 1 or 2 seconds For various reasons the boiler may fail to start...

Страница 15: ...y to convert to a different gas from that for which the boiler has been arranged get in touch exclusively by authorized technical staff CLEANING AND MAINTENANCE At the end of each heating season it is...

Отзывы: